My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4717 BELVEDERE AVE 2025-03-25
>
Address Records
>
BELVEDERE AVE
>
4717
>
4717 BELVEDERE AVE 2025-03-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 10:38:10 AM
Creation date
7/24/2024 10:20:27 AM
Metadata
Fields
Template:
Address Document
Street Name
BELVEDERE AVE
Street Number
4717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br />y BLUE RAVEN <br />1SMSOLAR BONDING CONNECTION GROUND PATHS <br />1 <br />] lJ <br />1 1 <br />' MOUNTINSTALLATION UUME ; PAGE 1403 N. Research Way <br />Orem, UT 84097 <br />1 <br />800.377.4480 <br />.________________________________________________________________________________________________________________________________ WWW.BLUERAVENSOLAR.COM <br />M06&ZFF <br />aONo��Gr i <br />� 1 <br />to <br />BONDING MIDCLAMP ASSEMBLY <br />OStainless steel Midclamp points, 2 per module, <br />pierce module frame anodization to bond <br />module to module through clamp. <br />© Serrated flange nut bonds stainless steel clamp <br />to stainless steeLT-bolt <br />© Serrated T-bolt head penetrates rail anodization <br />to bond T-bolt, nut, clamp, and modules to <br />grounded SM rail. <br />ENDCLAMP ASSEMBLY <br />OSerrated flange nut bonds aluminum Endclamp <br />to stainless steel T-bolt <br />Serrated T-bolt head penetrates rail anodization <br />© to bond T-bolt, nut, and Endclamp to grounded <br />SM rail <br />Note: End clamp does not bond to module frame. <br />Note: Only one lug per module row <br />BONDING MICROINVERTER <br />® <br />MOUNT <br />44 <br />J <br />L <br />C CC <br />i <br />v <br />Q <br />Z <br />U .0 <br />CL <br />o <br />0 cLn <br />t, <br />� �a <br />Lu ? <br />J <br />Lu <br />m � <br />NCo <br />0 <br />LLI <br />� (A <br />co <br />0 <br />v <br />a <br />cg <br />J <br />J <br />c v <br />c <br />W, <br />D <br />,.-., C <br />I <br />I <br />\ I \ <br />I \ <br />\ <br />\ <br />' I \ I <br />\ I <br />RAILTO L-FOOT <br />BONDING RAIL <br />WBONDING T-BOLT <br />SPLICE BAR <br />C <br />BONDING RAIL SPLICE BAR <br />OBonding Hardware creates bond between splice <br />bar and each rail section <br />©Aluminum splice bar spans across rail gap to <br />create rail to rail bond. Rail on at least one side <br />of splice will be grounded. <br />Note: Splice bar and bolted connection are <br />non-structural. The splice bar function is rail <br />alignment and bonding. <br />HEX NUT W/ CAPTIVE <br />LOCK WASHER <br />BONDING <br />T BOLT ,c�F <br />131 <br />BONDING MICROINVERTER MOUNT <br />OHex nut with captive lock washer bonds metal <br />microinverter flange to stainless steel T-bolt <br />© Serrated T-bolt head penetrates rail anodization <br />to bond T-boLt, nut,and L-foot to grounded SM raiL <br />System ground including racking and modules may <br />be achieved through the trunk cable of approved <br />microinverter systems. See page J for details <br />RAIL TO L-FOOT w/BONDING T BOLT <br />OSerrated flange nut removes L-foot anodization <br />to bond L-Foot to stainless steel T-bolt <br />©Serrated T-bolt head penetrates rail anodization <br />to bond T-bolt, nut, and L-foot to grounded <br />SM rail <br />RACK SYSTEM GROUND <br />OWEEB washer dimples pierce anodized rail to <br />create bond between rail and lug <br />©Solid copper wire connected to lug is routed to <br />provide final system ground connection. <br />NOTE: Ilsco lug can also be used when secured to <br />the side of the rail. See page K for details <br />CONFIDENTIAL, THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT BLUE RAVEN SOLAR NOR <br />SHALL IT BE DISCLOSED IN WHOLE OR <br />IN PART TO OTHERS OUTSIDE <br />RECIPIENTS ORGANIZATION, EXCEPT <br />IN CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE EQUIPMENT, <br />WITHOUT THE WRITTEN PERMISSION <br />OF BLUE RAVEN SOLAR LLC. <br />NABCEP <br />CERTIFIED <br />P V INS TALLATION <br />PROFESSIONAL <br />Scott Gurney <br />#P V-011719-015866 <br />CONTRACTOR: <br />BRS FIELD OP S <br />385-498-6700 <br />DRAWING BY: <br />PLOT DATE: <br />PROJECT NUMBER: <br />SHEET NAME: <br />SPEC SHEET <br />REVISION: PAGE NUMBER: <br />____ SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.