Laserfiche WebLink
1 <br />NNm6E SOLARHOOKS <br />■■ � PRO SERIES <br />1. Remove tiles around installation <br />area. <br />5. Reposition hook, secure with <br />included lag screws. <br />2. Locate and mark rafters. <br />6. Replace tiles, if necessary notch <br />with grinder to ensure proper fit. <br />UNIVERSAL; <br />INSTALLATION GUIDE <br />3. Position hook, adjusting arm -base <br />bolt position as needed. Use 3/16" <br />bit to drill 2 pilot holes. <br />Torque arm -base nut to 16 ft. lbs. <br />11� <br />Install components as shown above. <br />K, <br />PAGE <br />4. Remove hook, clean debris and <br />fill pilot holes with roofing <br />sealant. <br />Install components as shown above. <br />NOTE: SOLARHOOKS UNIVERSAL CT5 is compatible with all tile profiles. Installation process is the same for all tile profiles. <br />NOTE: Refer to the SOLARMOUNT or NXT HORIZON Installation Guide for the remaining system installation. <br />BLUE RAVEN <br />1403 N. Research Way <br />Orem, UT 84097 <br />800.377.4480 <br />W W W.BLUERAVENSOLAR.COM <br />CONFIDENTIAL- THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT BLUE RAVEN SOLAR NOR <br />SHALL IT BE DISCLOSED IN WHOLE OR <br />IN PART TO OTHERS OUTSIDE <br />RECIPIENTS ORGANIZATION, EXCEPT <br />IN CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE EQUIPMENT, <br />WITHOUT THE WRITTEN PERMISSION <br />OF BLUE RAVEN SOLAR LLC. <br />NABCEP <br />CERTIFIED <br />PV INSTALLATION <br />PROFESSIONAL <br />Scott Gumey <br />#PV-011719-015866 <br />CONTRACTOR: <br />BRS FIELD OPS <br />385-498-6700 <br />DRAWING BY: <br />PLOT DATE: <br />PROJECT NUMBER: <br />SHEET NAME: <br />SPEC SHEET <br />REVISION: <br />PAGE NUMBER: <br />V V <br />