Laserfiche WebLink
• 1110 10 of 27 <br /> Monday, July 17, 2023 <br /> ,1111.1 <br /> R&R CREW RESPONSIBILITIES & DETAILS: <br /> -Crew will install(10)Helical Piles,as well as(2)Concentric Piers,and lift home to maximum practical recovery. <br /> -Crew will install(5)4x4 Posts w/Adjustable 20"Composite Pads. <br /> HOMEOWNER RESPONSIBILITIES: <br /> -Have work area cleared where piles will be installed. <br /> ADDITIONAL INFO: <br /> -R&R will handle necessary permit and engineering coordination. <br /> -25%deposit,25%upon issue of permit and final 50%upon completion of project. <br /> -Permit cost is not included and will be billed on second 25%deposit payment. <br /> -Homeowner understands permit process may require the hiring of a WABO certified special inspector billed at additional <br /> fees depending on municipality. <br /> -Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. <br /> -Permitting/scheduling times may vary beyond R&R control. <br /> Material Clause: <br /> -Depth Clause:Piles are bid to 25'maximum depth.$20 per foot charge beyond that. <br /> -Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeowner <br /> approval. <br />