5of27 <br /> GENERAL NOTES <br /> CONCENTRIC/DRIVEN PILES <br /> 1. "CONCENTRIC" OR DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE <br /> WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC). <br /> 2. IT IS RECOGNIZED THAT THE SEATTLE BUILDING CODE (SBC) REQUIRES 8 INCH MINIMUM <br /> DIAMETER PIPE FOR PIPE PILE INSTALLATION. THE APPROPRIATE ANALYSIS/EVALUATION AND <br /> TESTING REQUIREMENTS IN ACCORDANCE WITH SEATTLE DEPARTMENT OF CONSTRUCTION & <br /> INSPECTIONS (SDCI) DIRECTOR'S RULE 10-2009 ARE PROVIDED TO ALLOW FOR USE OF PILES <br /> LESS THAN 8 INCHES IN DIAMETER AS REQUIRED BY SECTION 104.5 OF THE SBC. <br /> 3. DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED BY STABIL-LOC SYSTEMS, LLC,AND <br /> SHALL BE IN ACCORDANCE WITH ESR-4121. <br /> 4. ALL MATERIAL PROPERTIES OF DRIVEN PILE COMPONENTS SHALL COMPLY WITH ESR-4121. <br /> 5. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES <br /> ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING <br /> POLYMER (EAA)COATINGS (AC228). <br /> 6. ALL PILE COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING <br /> STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER <br /> AC358 SECTION 3.9. <br /> 7. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. <br /> 8. ONLY MANUFACTURER-APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. <br /> 9. DRIVEN PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE <br /> OF INCLINATION OF 1 DEGREE FROM VERTICAL PER SECTION 5.7 OF ESR-4121. <br /> 10. DRIVEN PILES SHALL BE INSTALLED TO THE MINIMUM FORCE REQUIRED TO PROVIDE THE <br /> MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO <br /> LESS THAN TWO(2). THE MAXIMUM INSTALLATION FORCE SHALL NOT EXCEED THE ALLOWABLE <br /> CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE ASSEMBLY. <br /> 11. ALL BRACKETS AND PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO <br /> ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS <br /> THAN TWO(2). <br /> 12. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED <br /> WITHOUT WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. <br /> 13. SPECIAL INSPECTION IN ACCORDANCE WITH IBC SECTION 1705.7 IS REQUIRED FOR INSTALLATION <br /> OF THE STABILLOC FOUNDATION PIERING SYSTEM. A GEOTECHNICAL SPECIAL INSPECTOR MUST <br /> VERIFY AND RECORD THE FOLLOWING: <br /> A. VERIFICATION OF MANUFACTURER PRODUCT MODEL NUMBERS <br /> B. TYPES, CONFIGURATIONS, AND IDENTIFICATIONS OF HYDRAULICALLY DRIVEN STEEL PIER <br /> SEGMENT AND ADJUSTABLE HEAD ASSEMBLY AS SPECIFIED IN ESR-4121 AND THE <br /> CONSTRUCTION DOCUMENTS. <br /> C. INSTALLATION PROCEDURES, ANTICIPATED AND ACTUAL PILING DEPTH <br /> D. TIP ELEVATIONS, THE INSTALLATION PRESSURE AND FINAL DEPTH OF THE DRIVEN <br /> FOUNDATION SYSTEM <br /> E. INCLINATION AND POSITION/LOCATION OF HYDRAULICALLY DRIVEN PIER SEGMENTS <br /> H. COMPLIANCE OF THE INSTALLATION WITH THE APPROVED CONSTRUCTION DOCUMENTS <br /> AND THIS EVALUATION REPORT. <br /> 14. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO <br /> MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON <br /> REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. <br /> DRIVEN PILE PROOF TESTING <br /> THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE <br /> (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE <br /> PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2018 SEATTLE BUILDING CODE (SBC). THE <br /> MAXIMUM TEST LOAD SHALL BE TWO-HUNDRED(200) PERCENT OF THE SPECIFIED DESIGN LOAD. <br />