My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 7/19/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 7/19/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:13 PM
Creation date
7/24/2024 4:14:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
7/19/2024
Council Approval Date
7/10/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
engineering construction services and Phase 2 engineering design services through bid award
Public Works WO Number
UP3739
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003587
Total Compensation
$1,094,052.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering Inc. 12/16/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A1 <br />City of Everett – Replacement of Reservoir 3 <br />Contract Amendment No 1 13 Scope of Services <br />Fee <br />The fee for Contract Amendment No. 1 is shown in the table below. Exhibit B1 includes a <br />detailed level of effort for this scope of services. <br />Task <br />Number Task Contract <br />Amount <br />Amendment No. <br />1 <br />New Contract <br />Amount <br />100 Project Management $314,060 $8,688 $322,748 <br />200 Preliminary Design <br />Report $159,280 $50,842 $210,122 <br />300 Phase 1 Design <br />Phase Services $1,110,762 $207,210 $1,317,972 <br />400 Phase 1 Bid Phase <br />Services $75,330 $ - $75,330 <br />500 Phase 2 Design <br />Phase Services $740,949 $ - $740,949 <br />600 Phase 2 Bid Phase <br />Services $77,990 $ - $77,990 <br />700.1 PLA/CWA Assistance $54,150 $ - $54,150 <br />700.2 Public Outreach $138,460 $ - $138,460 <br />700.3 Permitting Support <br />Services $41,910 $ - $41,910 <br />700.4 Survey Support <br />Services $80,848 $ - $80,848 <br />700.5 Geotechnical $100,590 $93,063 $193,653 <br />700.6 PFAS Reuse Plan $ - $58,800 $58,800 <br />800 <br />Unanticipated <br />Serves - <br />Management <br />Reserve <br />$69,025 $203,165 $272,190 <br />800.1 Reservoir No. 3 <br />Column Cap Retrofit $10,819 $ - $10,819 <br />800.2 8 MG Phase 1 <br />Reservoir Evaluation $19,827 $ - $19,827 <br />900 <br />Phase 1 Engineering <br />Services During <br />Construction <br />$ - $427,284 $427,284 <br />Subtotal $2,994,000 $1,049,052 $4,043,052 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.