My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 7/19/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 7/19/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:13 PM
Creation date
7/24/2024 4:14:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
7/19/2024
Council Approval Date
7/10/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
engineering construction services and Phase 2 engineering design services through bid award
Public Works WO Number
UP3739
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003587
Total Compensation
$1,094,052.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering Inc. 12/16/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXPENSES <br />City of Everett: City of Everett Reservoir No. 3 Replacement - Amendment No. 1 <br />Air Fare/round trip Lodging/day Car Rental/week Meals/day Mileage/mile (2023)Copies/Page 11x17 <br />Color <br />Copies/Page 8.5x11 <br />B&W <br />Travel Travel Travel Travel Travel Office Expenses Office Expenses <br />OTHER DIRECT COSTS <br />Each Each Each Each Each Each Each <br />Unit Cost $500.000 $159.000 $275.000 $71.000 $0.670 $0.900 $0.050 $3.70 0.00%3.00% <br />9 <br />Quantity 3 3 3 3 2000 500 5000 0.00 <br />Task Total $1,500.00 $477.00 $825.00 $213.00 $1,340.00 $450.00 $250.00 $0.00 $0.00 $5,055.00 $151.65 $5,206.65 <br />Total ODC 1,500.00$ 477.00$ 825.00$ 213.00$ 1,340.00$ 450.00$ 250.00$ -$ -$ 5,055.00$ 151.65$ 5,206.65$ ContingencyTech FeesTotal ODCODC MarkupTotal ODC + MarkupTask 900 - Phase 1 Engineering Services During Construction <br />Expenses Page 3 <br />EXHIBIT B1
The URL can be used to link to this page
Your browser does not support the video tag.