My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 7/19/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 7/19/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:13 PM
Creation date
7/24/2024 4:14:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
7/19/2024
Council Approval Date
7/10/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
engineering construction services and Phase 2 engineering design services through bid award
Public Works WO Number
UP3739
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003587
Total Compensation
$1,094,052.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering Inc. 12/16/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A1 <br /> 2707 Colby Avenue <br />Suite 700 <br />Everett, WA 98201 <br />(425) 744-7440 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> City of Everett <br />Replacement of Reservoir 3 <br />Contract Amendment No. 1 <br /> <br />Scope of Services <br /> <br />June 10, 2024 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.