My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1201 SE EVERETT MALL WAY HONG YUN MASSAGE 2024-10-24
>
Address Records
>
SE EVERETT MALL WAY
>
1201
>
HONG YUN MASSAGE
>
1201 SE EVERETT MALL WAY HONG YUN MASSAGE 2024-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 1:56:17 PM
Creation date
7/26/2024 9:23:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1201
Tenant Name
HONG YUN MASSAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: B2403-152 <br />Applied: 3/28/2024 <br />Issued: 4/29/2024 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:4/27/2024 <br />F i n a l ed : 7/9/2024 <br />Description: ADDING 3 NEW WALLS, CUTTING OUT DOORWAY <br />Site Address: 1201 SE EVERETT MALL WAY STE C <br />City, State Zip Code: EVERETT, WA 98208-2801 <br />Applicant: JIM YAUN <br />Owner: EVERETT MALL 11 LLC <br />Contractor: TEGRIDY DRYWALL & PAINT <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />5/3/2024 <br />5/3/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />PARTIAL <br />See notes <br />APPROVAL <br />Notes: <br />206-859-7289 <br />bmwhoo@gmail.com <br />mas changed Inspection Type from BLDG 10-DRYWALL NAILING to BLDG 08-FRAMING <br />framing of partition walls in the front 2 rooms only. Do not cover walls in restroom. <br />5/8/2024 <br />5/8/2024 <br />BLDG 10-DRYWALL <br />Matt Schreifels <br />PARTIAL <br />see notes <br />NAILING <br />APPROVAL <br />Notes: <br />Jim 206-859-7289 <br />Drywall nailing approval of partition walls in the front 2 rooms only. Do not cover walls in restroom. Reschedule for framing and drywall nailing <br />inspection once all subpermits have been rough in approved. <br />6/28/2024 <br />6/28/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />APPROVAL <br />Notes: <br />6/28/2024 <br />6/28/2024 <br />BLDG 10-DRYWALL <br />Matt Schreifels <br />APPROVAL <br />NAILING <br />Notes: <br />7/3/2024 <br />7/3/2024 <br />BLDG 10-DRYWALL <br />Matt Schreifels <br />OTHER <br />duplicate inspection see notes <br />NAILING <br />Notes: <br />JIM <br />BMWH00@GMAIL.COM <br />206-859-7289 <br />See drywall inspection approval dated 6/28/24. <br />7/9/2024 <br />7/9/2024 <br />BLDG 16-FINAL <br />Matt Schreifels <br />APPRVD-PERMIT <br />FINAL <br />Notes: <br />Jim 206-859-7289 <br />I <br />Printed: Thursday, 25 July, 2024 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.