My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2520 100TH ST SE 2024-11-07
>
Address Records
>
100TH ST SE
>
2520
>
2520 100TH ST SE 2024-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 2:22:25 PM
Creation date
7/26/2024 9:41:44 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
2520
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 Washington State Energy Code—Residential <br /> Prescriptive Energy Code Compliance for All Climate Zones in Washington <br /> Single Family—New&Additions(effective February 1, 2021) <br /> Table 406.3—Energy Credits(Single Family) <br /> Option Description Credits:SF <br /> 6.RENEWABLE ELECTRIC ENERGY OPTION <br /> For each 1200 kWh of electrical generation per housing unit provided annually by on-site wind <br /> or solar equipment a 1.0 credit shall be allowed,up to 3 credits.Generation shall be calculated <br /> as follows: <br /> For solar electric systems,the design shall be demonstrated to meet this requirement using <br /> the National Renewable Energy Laboratory calculator PVWATTs or approved alternate by the <br /> code official. <br /> 6.1 Documentation noting solar access shall be included on the plans. For wind generation 1.0 <br /> projects designs shall document annual power generation based on the following factors:the <br /> wind turbine power curve;average annual wind speed at the site;frequency distribution of the <br /> wind speed at the site and height of the tower. <br /> To qualify to claim this credit,the building permit drawings shall specify the option being <br /> selected and shall show the photovoltaic or wind turbine equipment type,provide <br /> documentation of solar and wind access,and include a calculation of the minimum annual <br /> energy power production. <br /> 7.APPLIANCE PACKAGE OPTION <br /> All of the following appliances shall be new and installed in the dwelling unit and shall meet <br /> the following standards: <br /> Dishwasher—Energy Star rated <br /> Refrigerator(if provided)—Energy Star rated <br /> Washing machine—Energy Star rated <br /> 7.1 Dryer—Energy Star rated,ventless dryer with minimum CEF rating of 5.2. 0.5 <br /> To qualify to claim this credit,the building permit drawings shall specify the option being <br /> selected and shall show the appliance type and provide documentation of Energy Star <br /> compliance.At the time of inspection,all appliances shall be installed and connected to <br /> utilities. Dryer ducts and exterior dryer vent caps are not permitted to be installed in the <br /> dwelling unit. <br /> Rev.10-27-22 Prescriptive Path—Single Family 2018 Washington State Energy Code-R 9 ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.