Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />BLDG 05- <br />4/22/2024 <br />4/22/2024 <br />UNDERFLOOR <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />FRAMING <br />Notes: <br />4/21/2024 9:02 AM Fatoumata Trawally <br />Contact Name: Brandon Liu <br />Site Address: 2520 100TH ST SE <br />Phone:4259002848 <br />e-Mail: Ssttl205@hotmail.com <br />Provide positive connections between floor joist and floor. Ok to install rigid insulation in floor. Do not cover floor. Reschedule framing and insulation <br />inspection when ready. <br />BLDG 05- <br />4/25/2024 <br />4/25/2024 <br />UNDERFLOOR <br />RAKEEB KHAN <br />APPROVAL <br />FRAMING <br />Notes: <br />Floor framing for garage conversion only. <br />BLDG 06- <br />4/25/2024 <br />4/25/2024 <br />UNDERSLAB <br />RAKEEB KHAN <br />APPROVAL <br />see notes <br />INSULATION <br />Notes: <br />4/24/2024 8:21 AM Fatoumata Trawally <br />Contact Name: Brandon liu <br />Site Address: 2520 100TH ST SE <br />Phone:4259002848 <br />e-Mail: ssttl205@hotmail.com <br />Continuous insulation on top of slab. <br />5/29/2024 <br />5/29/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />5/28/2024 11:54 AM Fatoumata Trawally <br />Contact Name: Fatoumata Trawally <br />Site Address: 2520 100TH ST SE <br />Phone:4259002848 <br />e-Mail: ft142003@yahoo.com <br />BLDG 09-FIRE <br />5/29/2024 <br />5/29/2024 <br />STOPPING/BLOCKIN <br />Matt Schreifels <br />APPROVAL <br />G <br />Notes: <br />I <br />Printed: Wednesday, 17 July, 2024 2 of 3 rk <br />SUPERION <br />