My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2379-99
>
Ordinances
>
Ordinance 2379-99
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2014 2:35:18 PM
Creation date
3/24/2014 2:35:10 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2379-99
Date
2/10/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERGREEN WAY STORM DRAIN (PHASE II) <br /> Description: Construct new storm drain <br /> Location: Evergreen Way from Madison to Reservoir No. 3 site <br /> Justification: (Need/Demand) We have hired the contractor and he has done <br /> the work so we better pay him. <br /> Amounts in $1,000 <br /> 1110110110. 64."—,"•;* 4 410171 :ACCI2 ISNOT 20644111t: <br /> Lad&right-d-way $0 <br /> Desigi&Engineering $0 <br /> Construction $400 $400 <br /> Other $0 <br /> $0 <br /> Tctal $400 $0 $0 $0 $0 $0 $400 <br /> SOur 'cal : T€7.i=f ! . �.�.',20� � 2002002 �• ;t,' 2003 i, <br /> ;100440„7dal <br /> General Fund $0 <br /> Mdigaticn Fees $0 <br /> Assessments $0 <br /> Grants $0 <br /> Rates $400 $400 <br /> Other $0 <br /> $0 <br /> Total $400 $0 $0 $0 $0 $0 $400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.