My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2379-99
>
Ordinances
>
Ordinance 2379-99
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2014 2:35:18 PM
Creation date
3/24/2014 2:35:10 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2379-99
Date
2/10/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MERRILL-RING CREEK REGIONAL DETENTION POND <br /> Description: Design and construction of a regional stormwater detention/ <br /> treatment facility <br /> Location: The northeast corner of Hardeson and Upper Ridge Road <br /> Justification: (Need/Demand) To help prevent downstream flooding and <br /> streambank/streambed erosion and sediment deposition. <br /> Amountsyy � in $1,000 �Q`.,(yj a <br /> Yr ...y c� 1 r 2000 f:�,. .k ,kui E2:i% � o <br /> Land&right-cf-way $0 <br /> Desig,&En jneering $70 $70 <br /> Constructicn $455 $455 <br /> Other $0 <br /> $0 <br /> Total $70 $455 $0 $0 $0 $0 $525 <br /> NINIANISECIre40400W1994#~2C0040144 2001 ;; _ g 200214:404=0 AMR:ZOI teqratadM <br /> General Fund $0 <br /> Nftigeticn Fees $0 <br /> Assessmerts $0 <br /> Grants $0 <br /> Elates $70 $455 $525 <br /> Other $0 <br /> $0 <br /> Tatal $70 $455 $0 $0 $0 $0 $525 <br />
The URL can be used to link to this page
Your browser does not support the video tag.