Laserfiche WebLink
- -- w <br /> 6 of 31 <br /> PROJECT NO. SHEET NO. <br /> -- <br /> 4,,� S230503-2XR <br /> �i 2118 Jefferson PI Everett WA 2 <br /> PROJECT 98 03 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY JT DATE 08/29/2023 <br /> Ideal Foundation Systems 2-71 8"0 Helical Rile(0.203-inch wall thickness)-Soil Capacity per ESR-3750 <br /> DIGGA 10K Drive Torque, Torque Correlation Factor, Ultimate Axial Compressive Capacity, Allowable Axial Compressive Capacity, <br /> Head Pressure T Kt(Compression) P•=((t•T p,=o,5•p, <br /> (psi) (ft•lbs) (ft's) (kips) (kips) <br /> 500 1,740 9 15.7 7.8 <br /> 600 2,088 9 18.8 9,4 <br /> 700 2,436 9 21.9 11.0 <br /> 800 2,784 9 25.1 12.5 <br /> 900 3,132 9 28.2 14.1 <br /> 1000 3,480 9 31.3 15.7 <br /> 1100 3,828 9 34.5 17.2 <br /> 1200 4,176 9 37.6 18.8 <br /> 1300 4,524 9 40.7 20.4 <br /> 1400 4,872 9 43.8 21.9 <br /> 1500 5,220 9 47.0 23.5 <br /> 1600 5,568 9 50.1 25.1 <br /> 1700 5,916 9 53.2 26.6 <br /> 1800 6,264 9 56.4 28.2 <br /> 1900 6,612 9 59.5 29.8 <br /> •See Note viii. <br /> 2000 6,960 9 62.6 31.3 <br /> 2100 7,308 9 65.8 32.9 <br /> 2200 7,656 9 68.9 34.5 <br /> 2300 8,004 9 72.0 36.0 <br /> 2385 8,300 9 74.7 37.3 •See Note ii. <br /> i.)DIGGA 10K Drive Head differential pressure display to torque output has been pulled from the attached conversion charts provided by DIGGA. <br /> ii.)Per Table SA of ESR-3750 and Ideal Manufacturing Inc.,the maximum installation torque rating of a 2-7/8"0 helical pile(0.203-inch wall thickness)is 8,300 <br /> ft"lbs.Final installation torque shall not exceed this value. <br /> hi.)Piles shall reach a torque that correlates with an allowable capacity that meets or exceeds the maximum allowable load demand as listed in the structural <br /> package,but shall not exceed the maximum allowable capacity for any part of the pile assembly. <br /> iv.)Refer to ESR-3750 and Ideal Manufacturing,Inc.documents for additional information and requirements. <br /> v.)Definitions per ESR-3750: <br /> T=Final Installation torque in ft"lbs;the last torque reading taken during pile installation,using,for example,the torque reading <br /> instruments connected to the installation equipment. <br /> Kt=Torque correlation factor per ESR-3750 <br /> P.=Ultimate axial compressive capacity(in kips)of helical pile <br /> P.=Allowable axial compressive capacity(in kips)of helical pile <br /> vi.)For torque readings between those listed,use the following equation to determine the allowable capacity:P,=(T'9(J/2 <br /> vii.)1 kip=1,000 lin <br /> viii.)Per Note 3 of Ideal Group Dwg No.:278TFG dated 4/23/20,the ultimate structural capacity for the2 7/8"TRU-FORCE Underpinning Bracket is limited to <br /> 60 kips. <br /> L120 ENGINEERING&DESIGN <br />