Laserfiche WebLink
8 of 31 <br /> Friday, August 25, 2023 Fes.. <br /> SCOPEOF WORK FOUNDATION SPECIALIST <br /> R&R CREW RESPONSIBILITIES & DETAILS: <br /> -Crew will install 9 3" Helical Piles to lift structure to maximum practical recovery. <br /> -Crew will remove&replace 3 (roughly 2x2 area's)to allow for pile installation <br /> -Crew will be installing 48'of 6"C channeling to home's foundation at the designated locations to strengthen and reinforce <br /> -Crawlspace Height is 2'-3'tall <br /> - Footing Depth is 2'deep <br /> -Crawlspace access is located on interior <br /> -Crew will be excavating 2x2 area's in locations where all helical piles will be installed <br /> -Crew will lay plastic out for all excavated soils and debris. <br /> HOMEOWNER RESPONSIBILITIES: <br /> -Have work area cleared of furniture and or materials where piles will be installed inside garage. <br /> - Have necessary landscaping& plants removed in designated locations piles will be installed prior to crew's arrival. <br /> - Provide inside structure on day of lift to gather elevation measurements <br /> ADDITIONAL INFO: <br /> - R&R will handle necessary permit and engineering coordination. <br /> -25%deposit,25% upon issue of permit and final 50%upon completion of project. <br /> -Permit cost is not included and will be billed on second 25%deposit payment. <br /> -Homeowner understands permit process may require the hiring of a Geotechnical Engineer and or a WABO certified special <br /> inspector billed at additional fees depending on municipality. <br /> - Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. <br /> -Permitting/scheduling times may vary beyond R&R control <br /> Material Clause: <br /> -Depth Clause: Piles are bid to 25 foot maximum depth.$20 per foot charge beyond that. <br /> -Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeonwer <br /> approval <br />