My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2118 JEFFERSON PL 2024-10-25
>
Address Records
>
JEFFERSON PL
>
2118
>
2118 JEFFERSON PL 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 7:51:43 AM
Creation date
7/30/2024 10:12:09 AM
Metadata
Fields
Template:
Address Document
Street Name
JEFFERSON PL
Street Number
2118
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I of 6 <br /> LONGITUDE <br /> ONE TWENTYO <br /> ENGINEERING&DESIGN <br /> Pile Review for Structural Compliance <br /> Date: February 20th, 2024 <br /> Project Name: Foundation Stabilization/Lift — Everett Project Number: 5230503-2XR <br /> Project Location: 2118 Jefferson Pl, Everett, WA 98203 <br /> Client's Name: R&R Foundation Specialist, LLC <br /> To Whom It May Concern: <br /> The purpose of this letter is to confirm pile installation and capacity compliance with the structural require- <br /> ments specified in the L120 Structural Calculation Package and Structural Site Plan dated August 291h <br /> 2023. <br /> During the week of January 10th, 2024, nine (9) helical piles were installed by R&R Foundation Specialists <br /> (R&R) to stabilize areas of the single-family residence located at 2118 Jefferson Pl, Everett, WA 98203. The <br /> EOR from L120 Engineering and Design was present on site during the pile installation. To the knowledge of <br /> L120, these piles were installed by R&R certified installers in accordance with the cited structural package, <br /> ESR-3750. Please refer to the attached drive log and photographs provided by R&R. <br /> The helical piles were installed with maximum pile spacing of 8'-0"on-center, the typical minimum required <br /> vertical capacity as determined by L120 is shown in the table below. These demand requirements are as <br /> determined and specified in L120's structural calculation package cited above. <br /> PILE SPACING&LOAD REQUIREMENTS TABLE <br /> MAX O.C.SPACING,ft MIN VERTICAL CAPACITY,kips PROOF TESTING LOAD,kips <br /> PILE# PILE TYPE 200%MIN VERTICAL CAPACITY LOCATION <br /> BTWN PILES END OFFSET ALLOWABLE LOADING <br /> (MIN ULTIMATE CAPACITY) <br /> 1-2,5 8'-0" 5.0 k/PILE 10.0 k/PILE GARAGE <br /> 3-4 HELICAL 8'-0, PER PLAN 7.0 k/PILE 14.0 k/PILE GARAGE <br /> 6-7 7'-0" 11.0 k/PILE 22.0 k/PILE EXTERIOR <br /> 8-9 8'-0" 10.0 k/PILE 20.0 k/PILE GARAGE <br /> Pile capacities for the helical piles have been calculated using a Digga HH-6K drive head with a torque <br /> correlation factor, Kt, of 9 as prescribed in ESR-3750. A chart showing the resulting capacities is attached <br /> to this letter. Per the attached document, an Ideal Foundation Systems 2-7/8" diameter helical pile installed <br /> to a minimum pressure of 1,000 psi results in a maximum allowable capacity of 14.0 kips including a safety <br /> factor of 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.