My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1407 80TH ST SW 2024-11-07
>
Address Records
>
80TH ST SW
>
1407
>
1407 80TH ST SW 2024-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 1:35:33 PM
Creation date
7/30/2024 1:26:45 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1407
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTO ROSENAU & ASSOCIATES, INC. <br /> Geotechnical Engineering, Construction Inspection & Materials Testing <br /> CONSTRUCTION INSPECTION REPORT <br /> Report Number: SW462383 <br /> Project Name: Achilles USA- Flooring Repair Job Number: 23-0858 <br /> Project Address: 1407 SW 80th Street, Everett Permit: B2307-021 <br /> Client Name: Achilles USA <br /> Inspections Performed <br /> --- - - - <br /> Steel Decking ❑ Other(specify): <br /> _.......... <br /> Structural Steel Fabrication 1 ❑ <br /> Structural Steel Erection I [) <br /> ....... ._........... ................. --..... _-....._.__.-._......._.._.........—......................................-........................-..._.-.-...-...... - ----.........................._..........._.................... <br /> Inspector: John Fraser Inspection ©ate: December 29, 2023 <br /> Remarks <br /> On site for ORA at contractor's request for inspection of structural steel welding. Inspection covers the requirements for <br /> material I.D. and condition of structural members, AISC 360 and approved construction documents. <br /> Ref: Pacific Engineering Technologies, Inc.job#23086.00, sheet 3 w/details on sheet 4 <br /> - Inspected added truss stiffener plates welded to bottom chord framing in various locations <br /> throughout L2 framing within grids A-H/3-6 <br /> This scope of work is in conformance per approved contract documents <br /> WABO Certified Welder information and weld procedures verified and available on site. <br /> Conforms <br /> Copies to; - CSj«e cR«01 Date: 2024.01 .03 <br /> �] Client ❑�/ Engineer ❑ Others Technical Responsibility: CJ08:28:25 -08,00 <br /> ❑ Owner [I Contractor <br /> Isaac Ruoff, Project Manager <br /> [I Architect F.] Building Dept <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates,Inc. Reproduction of this <br /> report except in full,without written permission from our firm is strictly prohibited. <br /> 6747 M.L. King Way S.,Seattle,Washington 98118-Phone(206)725-4600-Fax(206)723-2221 <br /> Form No.:ADMIN-63-06(Rev 11/23) Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.