Laserfiche WebLink
From: <br />Dennis Osborn <br />To: <br />"Shy Gounder" <br />Cc: <br />Rakeeb Khan <br />Subject: <br />FW: BP2103-052 <br />Date: <br />Thursday, March 24, 2022 1:55:00 PM <br />Attachments: <br />imaae001.Dna <br />Residential Construction Submittal Checklist (PDF) with attachments 201904181017087664 (1).Ddf <br />imaae002.Dna <br />imaae005.Dna <br />Good afternoon Shy <br />I reviewed your most recent submission for 1820 Silver Lake road. Absent is the Building Height <br />survey elevation application which is attached. This needs to be completed prior to planning singing <br />off on the site plan to verify height of structure. As noted earlier, the height survey being on page 4 <br />of the attachment, please ensure a surveyor completed this and has it returned to Permit Services. <br />Thankyou <br />Dennis Osborn <br />Planner I Community, Planning and Economic Dev. <br />425-257-7176 2930 Wetmore, Suite 8A, Everett, WA 98201 <br />everettwa.gov Facebook I Twitter <br />From: Dennis Osborn <br />Sent: Wednesday, January 26, 2022 5:04 PM <br />To: Shy Gounder <shy@shynan.com> <br />Subject: BP2103-052 <br />Good afternoon Shy. <br />The elevation on the building is within 1 foot of the maximum height so an elevation survey is <br />needed. This is in the application package you had for the residential construction submittal <br />checklist. I have attached it for you/architect to complete. <br />Thankyou <br />Dennis Osborn <br />Planner I Community, Planning and Economic Dev. <br />425-257-7176 2930 Wetmore, Suite 8A, Everett, WA 98201 <br />everettwa.gov Facebook I Twitter <br />