Laserfiche WebLink
DAILY FIELD REPORT <br />"- AAR TESTING AND INSPECTIO Nr INC. <br />7126 180th Ave NE, Suite C101 <br />Redmond, WA 98052 <br />425-881-5812 <br />InsP cui n pace <br />07/11/2023 <br />R¢Por Number <br />PU071123A <br />CLIENT INFORMATION <br />PROJECT INFORMATION <br />Contact <br />Marc Allan <br />Project No. <br />23-425 <br />Company <br />Northwest Handling Systems, Inc <br />Project Name <br />Hellon Energy <br />Address <br />1100 SW 7th Street <br />Address <br />1520 Both St SW, Suite B <br />City <br />Renton <br />City <br />Everett <br />Contractor <br />NW Handling Systems <br />Permit No_ <br />132307-016 <br />INSPECTION TYPE(5) <br />STRUCTURE(S)/ LOCATION(5) <br />Q Proprietary <br />Anchors - Mechanical Storage Racks on <br />East side wall of building <br />W¢ab,ar <br />Cloudy <br />T Pft -atura (^F) <br />60 <br />start Tim¢ <br />09:00 AM <br />E.,a -ni. <br />01:00 PM <br />DRAWINGS / DOCUMENTS REFERENCED <br />53, and ESR-1917 <br />INSPECTION OBSERVATION / REMARKS _ <br />Torque Inspection: <br />As requested, I was on site for torque inspection for the storage racks on East side wall of building. Using a torque wrench, I torqued the HILTI <br />KB = 1/2"x5 1/2" bolt anchors to 40 foot pounds. <br />Items inspected are in conformance with approved plans, specifications, and jurisdictional raq uirements <br />Insp¢C[ Nam¢ Report 03te R¢VI@W¢r9 signature ay R¢ ¢d onr0 <br />ctors siynatur¢ Pablo Ulloa 07/11/2023 <br />1 .i�,;� Teajalam (T]) Gounden 07/15/2023 <br />'- <br />