My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2802 COLBY AVE WOJCIK YOGA STUDIO 2024-10-24
>
Address Records
>
COLBY AVE
>
2802
>
WOJCIK YOGA STUDIO
>
2802 COLBY AVE WOJCIK YOGA STUDIO 2024-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 1:20:42 PM
Creation date
7/31/2024 10:15:11 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2802
Tenant Name
WOJCIK YOGA STUDIO
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet Aii(FOR PERMIT STAFF ONL19 PERMIT#lbZ J(0 -c6,0 <br /> BUILDING IP ANNING <br /> Intake OK by: Date: Intake OK by: 1 Assign To: J e 55 Date:7/13/Z S <br /> Intake Comments: Intake Comme ts: <br /> Zone M l) <br /> Overlay/Agreement 1-,t e-vCcol pea• srkcee.'s- <br /> ❑ Route to Commercial Building Nonresidential Use en'reck'a"^"^e'^h•/e c j� r'' <br /> ❑ Route to Residential Building Residential Use N/A <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: N/A <br /> Bldg/TI/Addn/Rem Size Total No. of Dwelling Units: N/A <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes n No <br /> Number of Stories "In Lieu"Fee:Type: Amount$0 <br /> Basement ❑No ❑Yes , Fin/Unfin School Impact Fee: Total $ 0 <br /> Type of Construction y—;(' Calculated: Credit: <br /> Occupancy Group ,g ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System 1Not Req'd Park Impact Fee Total$ 0 (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ONew System,ot Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes RNo 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ,No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total $ !'000.00 Additional Notes: <br /> Approved By: Date: -7,43/Z3 <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: (i IVI 202d <br /> Intake Comments: PW Worksheet Needed if: <br /> � <br /> h,o-frA.f'f ibmi H (ii. ❑Sys Dev Eval(Util/SW)DTraffic Mit Eval <br /> Approved AD Date:0.,g/d7trf W 140Vt V►.A 'Ni1(� ❑Site Work/Drainage ❑Address Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> This Permit is Approved by Public Works <br /> Fire Dept. Fees: 0 See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required (Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> lEt Review/Inspection Scope-ADD FIRE FEE 0 Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: \, ,fir,J r? Date: 7_i3,.23 ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> tgl Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By jitJi1/y14dWJ Date: flL 2O 7,b2b <br />
The URL can be used to link to this page
Your browser does not support the video tag.