Laserfiche WebLink
NiEw <br />-K OaSE <br />TOILET <br />N <br />3 OPENO03 <br />a <br />D'V' <br />ON: <br />AD IV' <br />®[x <br />E <br />EXISTING GYP BID �� <br />CEILING ® 8'-B" ARE <br />TAX AX AREA <br />1Dz <br />E <br />TAX AREA <br />1Dz <br />TO REMAIN <br />D' <br />THROUGHOUT TENANT <br />SPACE <br />D'V' <br />D'V' <br />®E, <br />= <br />E <br />III <br />D'V' <br />^� <br />E <br />RECEP <br />D'VOTao <br />1 <br />- RECEP <br />100 <br />J 0 <br />WAITING <br />tat <br />WAITING <br />tat <br />N <br />3 <br />oR <br />PLAN <br />NORTH <br />REFLECTED CEILING PLAN <br />LOW VOLTAGE PLAN <br />POWER PLAN <br />SCALE: 1/8" = 1'-0" <br />SCALE 1/8" = V-0" <br />SCALE: 1/8" = 1'-0" <br />REFLECTED CEILING PLAN GRAPHIC LEGEND <br />CSP <br />POWER WHIP & D/V HOOK-UP <br />CANVAS CSP DESK ELECTRICAL <br />POWER KEYED NOTES <br />POWER VOICE DATA PLAN GRAPHIC LEGEND <br />1'X LED LIGHT FIXTURE RETURN AIR GRILLE <br />OCONTRACTOR TO INSTALL JUNCTION BOX AS DIMENSIONED (6" <br />EP ELECTRICAL PANEL $ SWITCH <br />0 E (EX=EXISTING, REL=RELOCATE, <br />(E=EXISTING, REL=RELOCATE, <br />_ _ -- - <br />-- <br />FROM FINISHED FLOOR TO BOTTOM OF EACH J-BOX) AT WALL: <br />-JUNCTION BOX TO HAVE ELECTRICAL WHIP TO ACCOMMODATE <br />4'x4' PLYWOOD PHONE BOARD, PAINTED LABEL VISIBLE <br />PH ( ) $3 3-WAY SWITCH <br />N=NEW) N=NEW) <br />CSP DESK IT <br />_ _ <br />(6) DUPLEX OUTLETS. <br />j VOICE/DATA - (D THERMOSTAT <br />SUPPLY AIR DIFFUSER <br />® <br />WALL INSTALLATION <br />/ <br />RETURN TRIP AFTER FURNITURE ARRIVES TO MAKE POWER <br />CONNECTION AT THE WALL AND TERMINATE AT KNOCK OUTS IN <br />DV ASSUME SINGLE GANG BOX TO BE INSTALLED AT EACH LOCATION WITH <br />A MUDDING AND PULLSTRING O JBox <br />( EX=EXISTING, REL=RELOCATE, <br />Duple[ Outlet Pawer WhiP <br />Connectron <br />PANEL BASE. <br />� VOICE/DATA (FLOOR BOX)- SWITCH FOR <br />❑ N=NEW <br />CEILING DUPLEX (EX -EXISTING, ) <br />REL=RELOCATE, N=NEW) EXHAUST FAN (EX -EXISTING, <br />o <br />2 <br />o <br />4. <br />II <br />OLEC/CLEC SERVICE TO BE LOCATED WITHIN 2'-0" OF PHONE <br />BOARD. IF EXISTING D-MARC & PATCH PANEL ARE NOT IN <br />LOCATION SHOWN, NOTIFY CONTACT. <br />DV ASSUME SINGLE GANG BOX AT EACH LOCATION. IF REQ'D BY CODE, PENDANTS <br />INSTALL 1" CONDUIT STUBBED AT CEILING AT ALL NEW I <br />PARTITIONS;MUDRING AND PULLSTRING ONLY AT EXIST. PARTITIONS EXISTING <br />REL=RELOCATE) <br />O <br />O <br />Dopler (1)VDou <br />[� <br />VOICE/DATA <br />(I)Data O(I)Vo�ce Outict Duplex (I)Volce <br />.— <br />3 CONTRACTOR TO PROVIDE AND INSTALL NEW 4'x4' PHONE BOARD <br />DEDICATED, GROUNDED 20-AMP QUAD, MARKED w/ORANGE <br />DDEVICE <br />COMBINATION ILLUMINATED EXIT <br />SIGN / EMERGENCY LIGHT <br />1 0 3 <br />0 <br />( I ) Data Outlet <br />Duplex Outlet <br />Blank <br />PER PLAN. <br />TO PROVIDE AND INSTALL NEW DEDICATED QUAD AT <br />EXISTING DATA <br />DUPLEX RECEPTACLE <br />( EX=EXISTING, REL=RELOCATE, <br />Duple Outlet <br />'If FlatW+re, Da[alloi¢ Entry <br />OCONTRACTOR <br />PHONE BOARD LOCATION. <br />�y EXISTING VOICE <br />RECEPTACLE <br />N=NEW) <br />VOICE DATA ELECTRIC <br />1p INSTALL NEW DIGITAL, PROGRAMMABLE THERMOSTAT AS SHOWN. <br />,ILQUADRAPLEX <br />`0'EEXISTING DUPLEX RECEPTACLE EXISTING JUNCTION BOX TO BE RE -USED <br />- CAT 6 CABLING TO BE INSTALLED PER <br />CEILING PLAN GENERAL NOTES <br />1. SUPPLY AND INSTALL [11 WHITE, 1-GANG, 3, SUPPLY AND INSTALL [11 WHITE, 1-GANG, <br />BLANK WALL -PLATE AS SHOWN ON PLANS. BLANK WALL -PLATE AS SHOWN ON PLANS. <br />WALL TERMINATIONS <br />DATA (D)-BLUE, CAT 6, RJ45 <br />NEW <br />EXISTING QUADRAPLEX RECEPTACLE <br />��LL <br />6,REMOVE EXISTING DUPLEX RECEPTACLE (SEE DEMO PLAN) Oo- OCCUPANCY SENSOR <br />1. THIS PLAN IS A DESIGN INTENT DRAWING ONLY. ALL ELECTRICAL LOAD CALCULATIONS ARE TO BE <br />COMPLETED BY A LICENSED ELECTRICIAN/ENGINEER IF REQUIRED. <br />AUGN INSTALL HEIGHT WITH ELECTRICAL WALL DRILL <br />7/8" HOLE IN CENTER OF PLATE. ALIGN <br />CONNECTOR/JACKS <br />2. SWITCHING IS NOT SHOWN, TO BE COMPLETED BY A LICENSED ELECTRICIAN/ENGINEER IF REQUIRED. <br />3. EXISTING DRYWALL CEILING TO REMAIN. PATCH/REPAIR AS NEEDED FROM DEMOLITION. <br />PLATE. PRODUCT SI7E AND INSTALL HEIGHT WITH <br />- HUBBDL PART #: NP7W DATA/VOICE WALL PLATE. <br />-VOICE (V)-WHITE, CAT 6, RJ45 <br />CONNECTORS/JACKS <br />LOW VOLTAGE KEYED NOTES <br />SITE SPECIFIC NOTES <br />4. GC TO PROVIDE AND INSTALL NEW SURFACE MOUNTED LED LIGHTS AS SHOWN ON FLOOR PLAN. <br />2. SUPPLY AND INSTALL [1] BLACK, 1- SPLIT <br />- THOMAS & BETTS PART #: DCCBWH <br />TERMINATE ON BLUE PAIRS <br />OCONTRACTOR TO INSTALL JUNCTION BOX AS DIMENSIONED (6" <br />1. ALL EXISTING UN -USED D/V TO BE REMOVED FROM JUNCTION BOX WITH A BLANK COVER PLATE (TO MATCH WALL <br />LOOM CORRUGATED TUBING AROUND DATA 4. SUPPLY AND INSTALL [7] BLACK, 90 DEGREE <br />-ANALOG (A) -BLACK, CAT 6, RJ45 <br />CABLES AND INSERT TUBING INTO LOW VOLTAGE TUBING CONNECTOR IN BLANK WALL PLATE. <br />CONNECTORS/JACKS <br />FROM FINISHED FLOOR TO BOTTOM OF EACH J-BOX) AT WALL: <br />COLOR) INSTALLED OVER THE BOX. <br />CABLE PLATE. <br />- PANDUD PART p: CLT10OF-C20 <br />- HUBBELL PART (f: P0509NBK <br />TERMINATE ON ORANGE PAIRS <br />LABEL ALL TERMINATIONS AT THE BACK ROOM (PATCH PANEL AND <br />66 BLOCK) AND WALL JACKS BEGINNING AT THE RECEPTION <br />COUNTER MOVING COUNTER CLOCKWISE AS YOU ENTER THE SPACE. <br />-JUNCTION BOX TO HAVE (3) DATA AND 2 VOICE CABLES <br />( <br />RETURN TRIP <br />AT KNOCK OUTS IN PANEL BASE.N CABLING FOR <br />DATA AND VOIAFTER FURNITURE ARRIVES RUN <br />CEILING PLAN KEYED NOTES <br />GENERAL NOTES <br />DUPLEX OUTLET TO BE INSTALLED FLUSH WITH WINDOW SOFFIT OR INSTALL FLUSH WITH ACS FOR LIGHT BOX <br />1. CAT 6 MUST BE USED FOR ALL CABLE RUNS (DATA, VOICE, AND ANALOG). <br />1 WHERE WINDOWS ARE FULL HEIGHT. <br />PARTITION WALLS ARE LABELED MOVING COUNTER CLOCKWISE WITH <br />O ALL DATA/VOICE CONNECTIONS TO BE CONSOLIDATED TO NEW <br />2. ALL CABLE RUNS MUST BE SUSPENDED ABOVE THE CEILING USING J HOOKS, 0 RINGS, OR AS LOCAL CODE REQUIRES <br />PERIMETER WALLS. POWER POLES ARE LABELED LAST IF USED IN <br />PHONE BOARD LOCATION PER PLAN. <br />3. PROVIDE 2' to 3' SERVICE LOOPS ABOVE CEILING. <br />THE SPACE. NUMBER SEQUENCE AS FOLLOWS: <br />4. TERMINATE AND LABEL ALL CABLING AT WALL AND BACK ROOM (PATCH PANELS; 1 DED DATA PANEL AND 1 DED VOICE <br />DATA- D1, D2, D3, D4... <br />PANEL) <br />VOICE- V1, V2, V3, V4... <br />5. EXTEND TELCO DMARC INTO BACK ROOM USING A TWENTY FIVE(25) PAIR OUTDOOR CABLE AND TERMINATE ON 66 <br />ANALOG- A1, A2, A3, A4... <br />BLOCK. <br />EN DMARC EXTENSION- PLEASE REFER TO THE LOW VOLTAGE SPECIFICATIONS FOR INSTRUCTIONS AND ADDITIONAL <br />INFORMATION. <br />LAWRENCE <br />GROUP <br />St. Louis <br />319 North 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314) 231-5700 <br />PROJECT TEAM: <br />GENERAL CONTRACTOR: <br />TBD <br />PROFESSIONAL ENGINEER <br />MKK now IMEG Consulting Engineers <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />MKK npw <br />CONSULTING ENGINEERS, INC. IMEG <br />Mechanical, ElecMcal & Energy Consultants <br />PROFESSIONAL SEAL: <br />�12948 REGISTERED <br />1 MCHr . <br />TIMOTHY P. RommmoM <br />STATE OF WA3HINGTON <br />05/23/2023 <br />PROJECTTITLE: <br />Ln <br />0 <br />0 <br />w <br />�C <br />M <br />1+1*o <br />w <br />0 <br />LL <br />�O <br />Z <br />J <br />V <br />d <br />� 00 <br />~ <br />a � <br />Z <br />L.Mi <br />a <br />m <br />H <br />Q <br />U <br />K <br />W Cz <br />J <br />0 <br />M <br />p) <br />N <br />0 <br />01 <br />V <br />cn <br />N <br />The Professional Archkect'ssealaffixed W thissheet <br />applies only to the material and items shown on this <br />sheet All drawings, Instruments or other documents not <br />exhibiting— sealshallnotbe considered prepared by <br />this a,Chft-, and this architect expressly disclaims any <br />and all responsibility forsuch plans, drawings or <br />documents not exhibiting this seal. <br />Thls drawing and details on It— the sole property of the <br />architect and may be used for this specific project only. <br />It shall not be loaned, copied or reproduced, In whole or <br />Pm or for any ode, purpose or project without the <br />written consent of the architect. <br />No. Description Date <br />SHEETTITUS <br />PROJECT NUMBER: <br />SHEET NUMBER: <br />2021932.001 <br />Brawn By: <br />BED <br />A2 <br />leeue Dare: <br />MAY 23, 2023 <br />