My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 RUCKER AVE FAST SIGNS 2024-10-25
>
Address Records
>
RUCKER AVE
>
2902
>
FAST SIGNS
>
2902 RUCKER AVE FAST SIGNS 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 11:37:05 AM
Creation date
7/31/2024 11:24:49 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2902
Tenant Name
FAST SIGNS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST-INSTALLED ANCHORS REPORT MAYES I lrerracon <br /> Report Number: M7231506.0001 <br /> Service Date: 07/21/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 07/24/23 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> MVM CMD LLC 2902 Rucker ADA Ramp <br /> Attn: Michael Morgan 2902 Rucker Ave <br /> 2284 W Commodore Way Ste 220 Everett, WA <br /> Seattle, WA 98199-1468 <br /> Project Number: M7231506 <br /> Permit No.: B2305-077 <br /> General Information <br /> Mike with MVM CMD LLC requested Mayes Terracon be on site for observation of the adhesive anchors being <br /> installed by Tom Shafer with Ace Concrete Cutting LLC. Mayes Terracon representative arrived at the site at <br /> 1100 and departed at 1500. <br /> The construction documents referenced for this observation include Ramp Structural. <br /> Anchor System Information <br /> The following adhesive types were used during today's observation: <br /> Adhesive ICC Report Adhesive Lot No. Exp. Date Time Until Full Cure Referenced <br /> No. <br /> 1 ESR Simpson Strong-Tie 1000296594 08/25/24 48 hours A4 <br /> SET-XP <br /> Anchor Installation <br /> Anchor installation was observed as follows, utilizing the adhesive(s) noted above: <br /> Adhesive Time Locations Quantity Anchor Length & Spacing&Edge Status <br /> No. Installed Size&Type Embedment Distance <br /> 1 1100 Ramp 52 #4 reinforcing steel 9"&6" 12"&2-1/2" Complies <br /> 1 1100 Ramp 6 #4 reinforcing steel 36"&6" 12"&2-1/2" Complies <br /> Holes were cleaned prior to installation using compressed air and brush. Ambient temperature during observation <br /> was 65°F. <br /> Additional Comments <br /> No. 4 reinforcing steel was used instead of#3. Extra row of(6) hooks in middle of foundation. <br /> Compliance <br /> Based on our observations and testing, the post-installed anchors referenced above appear to be in general <br /> accordance with the project documents. <br /> Services: Special Inspections/ Materials Testing <br /> Mayes/Terracon Rep.: Will Gardiner <br /> Reported To: MVM CMD LLC <br /> Contractor: MVM CMD LLC <br /> Report Distribution: <br /> (1)MVM CMD LLC,Michael Morgan (1)Mayes Testing Engineers,Inc, <br /> Donna Pollard <br /> (1)Mayes Testing Engineers,Inc,Todd Reviewed By: <br /> W i rte <br /> Barry Tuttle <br /> Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DM018,04-29-22,Rev.5 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.