Laserfiche WebLink
POST-INSTALLED ANCHORS REPORT MAYES I lrerracon <br /> Report Number: M7231506.0001 <br /> Service Date: 07/21/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 07/24/23 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> MVM CMD LLC 2902 Rucker ADA Ramp <br /> Attn: Michael Morgan 2902 Rucker Ave <br /> 2284 W Commodore Way Ste 220 Everett, WA <br /> Seattle, WA 98199-1468 <br /> Project Number: M7231506 <br /> Permit No.: B2305-077 <br /> General Information <br /> Mike with MVM CMD LLC requested Mayes Terracon be on site for observation of the adhesive anchors being <br /> installed by Tom Shafer with Ace Concrete Cutting LLC. Mayes Terracon representative arrived at the site at <br /> 1100 and departed at 1500. <br /> The construction documents referenced for this observation include Ramp Structural. <br /> Anchor System Information <br /> The following adhesive types were used during today's observation: <br /> Adhesive ICC Report Adhesive Lot No. Exp. Date Time Until Full Cure Referenced <br /> No. <br /> 1 ESR Simpson Strong-Tie 1000296594 08/25/24 48 hours A4 <br /> SET-XP <br /> Anchor Installation <br /> Anchor installation was observed as follows, utilizing the adhesive(s) noted above: <br /> Adhesive Time Locations Quantity Anchor Length & Spacing&Edge Status <br /> No. Installed Size&Type Embedment Distance <br /> 1 1100 Ramp 52 #4 reinforcing steel 9"&6" 12"&2-1/2" Complies <br /> 1 1100 Ramp 6 #4 reinforcing steel 36"&6" 12"&2-1/2" Complies <br /> Holes were cleaned prior to installation using compressed air and brush. Ambient temperature during observation <br /> was 65°F. <br /> Additional Comments <br /> No. 4 reinforcing steel was used instead of#3. Extra row of(6) hooks in middle of foundation. <br /> Compliance <br /> Based on our observations and testing, the post-installed anchors referenced above appear to be in general <br /> accordance with the project documents. <br /> Services: Special Inspections/ Materials Testing <br /> Mayes/Terracon Rep.: Will Gardiner <br /> Reported To: MVM CMD LLC <br /> Contractor: MVM CMD LLC <br /> Report Distribution: <br /> (1)MVM CMD LLC,Michael Morgan (1)Mayes Testing Engineers,Inc, <br /> Donna Pollard <br /> (1)Mayes Testing Engineers,Inc,Todd Reviewed By: <br /> W i rte <br /> Barry Tuttle <br /> Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DM018,04-29-22,Rev.5 Page 1 of 1 <br />