My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10217 19TH AVE SE DR SHARMA 2024-11-15
>
Address Records
>
19TH AVE SE
>
10217
>
DR SHARMA
>
10217 19TH AVE SE DR SHARMA 2024-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 7:58:08 AM
Creation date
8/2/2024 2:49:48 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10217
Tenant Name
DR SHARMA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/8/23,4:01 PM waenergycodes.com/print_project_summary_form.php?k=aWQ9MTg5MzkmZnZpPTE4JmN0aT0=&print=1 <br /> LIGHTING COMPLIANCE SUMMARY <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all R I d: i ed by: L2023 NEEA,All ri_hts reserved <br /> Project Title Avenue Dental-2018 WSEC For Building Dep nt Use: Date: Jun 08, 2023 <br /> 10217 ave,SE AUG 15 2023 <br /> Project Address suiteite 101 <br /> Project&Applicant Everett,WA 98208 <br /> Information Applicant Name Chelsea Rodgers , <br /> Applicant Phone 503-539-3657 CITY O EVE�L ` ' <br /> Applicant Email obsidiandesignpdx@gmail.com permit Services <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupant} All Commercial General Building Use Healthcare,Outpatient Building Cond.Floor 3,166 <br /> Type Therapy Area <br /> New Building Project Cond.Floor Area 3,166 <br /> Alteration <br /> Tenant Spaces—First Build or Floors Above Grade 3 <br /> General Project Types Out Addition Interior Lighting Lighting <br /> Scope Com Lance Method Compliance Method 1- <br /> Lighting Scope p General <br /> Lighting Project Description New dental office.New non-load bearing walls.restrooms ext'g <br /> Interior/Exterior Luminaire Replacement Compliance LPA Calculation Compliance <br /> Project Type (Interior includes both interior& <br /> Lighting Compliance Scope parking) Scope Method Adjustment Verification <br /> and Method Tenant Spaces—First Build No Calculation Adjustments <br /> Out Interior Lighting Building area selected COMPLIES <br /> Additional Efficiency <br /> Options Included <br /> Project Title Avenue Dental-2018 WSEC Date Jun 08,2023 <br /> Lighting Power Calculation TENANT SPACES—FIRST BUILD OUT-INTERIOR LIGHTING Compliance Verification COMPLIES <br /> Compliance Method Building area LPA Calculation Adjustment none <br /> Interior Lighting Power Allowance-Building Area <br /> Building Areas Gross Interior Area(SF) LPA(Watts/SF) Total Watts Allowed Total Proposed Watts Compliance Status by <br /> (SF x LPA x 1) By Building Area Building Area <br /> 1110 <br /> Healthcare clinic 1,539 0.70 1,077 722 COMPLIES <br /> Office 1,627 0.64 1,041 425 COMPLIES <br /> Proposed Lighting Power Density <br /> Watts per Total Watts <br /> New or Quantity of Fixtures,CLDs or Total Linear Watts per Linear Proposed <br /> Fixture Type/Application Fixture ID Building Area Existing-to-Remain Luminaires(#F) Fixture,CLD or Feet(LF) Foot(WpLF) (#F x WpF)or <br /> Luminaire(WpF) (LF x WpLF) <br /> Individual Fixtures <br /> Decorative ET2 Clear Cylinder Office New 5 31 155 <br /> Troffer ZR24 SERIES Healthcare clinic New 17 31 527 <br /> Recessed downlight PHILIPS-PR6 LYTE PROFILE Healthcare clinic New 13 15 195 <br /> Recessed downlight PHILIPS-PR6 LYTE PROFILE Office New 18 15 270 <br /> Project Title Avenue Dental-2018 WSEC Date Jun 08,2023 <br /> Proposed Fixtures Details TENANT SPACES-FIRST BUILD our-INTERIOR LIGHTING <br /> https://waenergycodes.com/print_project_summary_form.php7k=aWQ9MTg5MzkmZnZpPTE4JmN0aT0=&print=1 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.