STORM DRAINAGE NOTES
<br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED,
<br />OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND
<br />ACCEPTED BY THE CITY OF EVERETT.
<br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT
<br />DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS AND
<br />THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE,
<br />AND MUNICIPAL CONSTRUCTION (CURRENT EDITION).
<br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN
<br />OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR
<br />CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY
<br />ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES
<br />ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE
<br />PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE
<br />APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF
<br />RELATED CONSTRUCTION ON THE PROJECT.
<br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN
<br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE
<br />PRIOR TO STARTING CONSTRUCTION.
<br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP
<br />NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR
<br />WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT
<br />6. SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY
<br />ADOPTED STORMWATER MANAGEMENT MANUAL, POLICIES AND
<br />CRITERIA SET FORTH IN THE CITY OF EVERETT'S DESIGN AND
<br />CONSTRUCTION STANDARDS & SPECIFICATIONS.
<br />ADDITIONAL NOTES:
<br />7. ALL PIPE SHALL BE PLACED ON STABLE EARTH, OR IF IN THE OPINION
<br />OF THE INSPECTOR THE EXISTING FOUNDATION IS UNSATISFACTORY,
<br />THEN IT SHALL BE EXCAVATED BELOW GRADE AND BACK -FILLED WITH
<br />A GRAVEL MATERIAL TO SUPPORT THE PIPE.
<br />8. THE BACK FILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE
<br />PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6", MAXIMUM
<br />DEPTH 8"-9", THOROUGHLY STAMPING EACH LAYER. THESE
<br />COMPACTED LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH
<br />SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO
<br />COMPLETE THIS FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
<br />(REFER TO WSDOT STANDARD SPECIFICATIONS 7-04.3(3) AND
<br />2-03.2(14)C, METHOD B & C).
<br />9. CATCH BASIN OFFSETS ARE MEASURED TO CENTER OF GRATE.
<br />10. ALL CATCH BASINS SHALL BE TYPE A PER C.O.E. STANDARD DWG 402,
<br />EXCEPT AS OTHERWISE NOTED.
<br />11. ALL CATCH BASINS WITH A DEPTH OVER 5.0 FEET TO THE FLOW LINE
<br />SHALL BE A TYPE II CB OR LARGER (MANHOLE).
<br />12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL
<br />MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATES TO GRADE
<br />JUST PRIOR TO POURING CURBS AND PAVING.
<br />13. CATCH BASIN FRAME AND GRATE SHALL BE OLYMPIC FOUNDRY MODEL
<br />5435, LOCKING TYPE OR EQUAL. STANDARD GRATES SHALL BE USED
<br />UNLESS SPECIFIED OTHERWISE.
<br />14. UNLESS OTHERWISE NOTED, ALL STORM SEWER PIPE SHALL BE
<br />CORRUGATED POLYETHYLENE PIPE: THE MATERIAL SUPPLIED UNDER
<br />THIS SPECIFICATION SHALL BE HIGH -DENSITY CORRUGATED
<br />POLYETHYLENE SMOOTH INTERIOR PIPE AND SHALL BE
<br />MANUFACTURED IN CONFORMITY WITH THE LATEST AASHTO
<br />SPECIFICATIONS OR M 294 TYPE S AND THE MATERIAL COMPOUND
<br />SHALL CONFORM TO AASHTO M 294. COUPLERS SHALL COVER NOT
<br />LESS THAN ONE FULL CORRUGATION ON EACH ANNULAR SECTION OF
<br />PIPE AND PASS THE WSDOT STANDARD SPECIFICATION SECTION
<br />7-04.3(4)D LOW PRESSURE AIR TEST FOR STORM SEWERS.
<br />15. GALVANIZED STEEL PIPE SHALL HAVE TYPE 1 ASPHALT COATING.
<br />ALUMINIZED PIPE DOES NOT REQUIRE COATING.
<br />16. STORM WATER RETENTION/DETENTION FACILITIES, STORM DRAINAGE
<br />PIPE AND CATCH BASINS SHALL BE FLUSHED AND CLEANED PRIOR TO
<br />CITY OF EVERETT PUBLIC WORKS ACCEPTANCE.
<br />SECTION 19 & 30, TOWNSHIP 29 NORTH, RANGE 5 EAST, W.M.
<br />POLLUTANTS OTHER THAN SEDIMENT
<br />ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS,
<br />THAT OCCUR ONSITE SHALL BE HANDLED AND DISPOSED OF IN A MANNER
<br />THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER. GOOD
<br />HOUSEKEEPING AND PREVENTATIVE MEASURES WILL BE TAKEN TO
<br />ENSURE THAT THE SITE WILL BE KEPT CLEAN, WELL ORGANIZED, AND FREE
<br />OF DEBRIS. IF REQUIRED, BMPS TO BE IMPLEMENTED TO CONTROL
<br />SPECIFIC SOURCES OF POLLUTANTS ARE DISCUSSED BELOW.
<br />VEHICLES, CONSTRUCTION EQUIPMENT, AND/OR PETROLEUM PRODUCT
<br />STORAGE/DISPENSING:
<br />• ALL VEHICLES, EQUIPMENT, AND PETROLEUM PRODUCT
<br />STORAGE/DISPENSING AREAS WILL BE INSPECTED REGULARLY TO
<br />DETECT ANY LEAKS OR SPILLS, AND TO IDENTIFY MAINTENANCE
<br />NEEDS TO PREVENT LEAKS OR SPILLS.
<br />• ON -SITE FUELING TANKS AND PETROLEUM PRODUCT STORAGE
<br />CONTAINERS SHALL INCLUDE SECONDARY CONTAINMENT.
<br />• SPILL PREVENTION MEASURES, SUCH AS DRIP PANS, WILL BE
<br />USED WHEN CONDUCTING MAINTENANCE AND REPAIR OF
<br />VEHICLES OR EQUIPMENT.
<br />• IN ORDER TO PERFORM EMERGENCY REPAIRS ON SITE,
<br />TEMPORARY PLASTIC WILL BE PLACED BENEATH AND, IF RAINING,
<br />OVER THE VEHICLE.
<br />• CONTAMINATED SURFACES SHALL BE CLEANED IMMEDIATELY
<br />FOLLOWING ANY DISCHARGE OR SPILL INCIDENT.
<br />CHEMICAL STORAGE:
<br />• ANY CHEMICALS STORED IN THE CONSTRUCTION AREAS WILL
<br />CONFORM TO THE APPROPRIATE SOURCE CONTROL BMPS LISTED
<br />IN VOLUME IV OF THE ECOLOGY STORMWATER MANUAL. IN
<br />WESTERN WA, ALL CHEMICALS SHALL HAVE COVER,
<br />CONTAINMENT, AND PROTECTION PROVIDED ON SITE, PER BMP
<br />C153 FOR MATERIAL DELIVERY, STORAGE AND CONTAINMENT IN
<br />SWMMWW 2005
<br />• APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING
<br />FERTILIZERS AND PESTICIDES, SHALL BE CONDUCTED IN A
<br />MANNER AND AT APPLICATION RATES THAT WILL NOT RESULT IN
<br />LOSS OF CHEMICAL TO STORMWATER RUNOFF. MANUFACTURERS'
<br />RECOMMENDATIONS FOR APPLICATION PROCEDURES AND RATES
<br />SHALL BE FOLLOWED.
<br />DEMOLITION:
<br />• DUST RELEASED FROM DEMOLISHED SIDEWALKS SHALL BE
<br />CONTROLLED USING DUST CONTROL MEASURES (BMP C140).
<br />• STORM DRAIN INLETS VULNERABLE TO STORMWATER DISCHARGE
<br />CARRYING DUST, SOIL, OR DEBRIS WILL BE PROTECTED USING
<br />STORM DRAIN INLET PROTECTION (BMP C220 AS INDICATED ON
<br />THE PLAN).
<br />• PROCESS WATER AND SLURRY RESULTING FROM SAWCUTTING
<br />AND SURFACING OPERATIONS WILL BE PREVENTED FROM
<br />ENTERING THE WATERS OF THE STATE BY IMPLEMENTING
<br />SAWCUTTING AND SURFACING POLLUTION PREVENTION
<br />MEASURES C152 BMP .
<br />( )
<br />1. SLURRY AND CUTTING SHALL BE VACUUMED DURING
<br />CUTTING AND SURFACING OPERATIONS.
<br />2. SLURRY AND CUTTINGS SHALL NOT DRAIN TO ANY NATURAL
<br />OR CONSTRUCTED DRAINAGE CONVEYANCE.
<br />3. COLLECTED SLURRY AND CUTTINGS SHALL BE DISPOSED OF
<br />IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR
<br />SURFACE WATER QUALITY STANDARDS.
<br />CONCRETE AND GROUT:
<br />• PROCESS WATER AND SLURRY RESULTING FROM CONCRETE
<br />WORK WILL BE PREVENTED FROM ENTERING THE WATERS OF THE
<br />STATE BY IMPLEMENTING CONCRETE HANDLING MEASURES (BMP
<br />C151).
<br />1. CONCRETE TRUCK CHUTES, PUMPS, AND INTERNALS SHALL
<br />BE WASHED OUT ONLY INTO FORMED AREAS AWAITING
<br />INSTALLATION OF CONCRETE OR ASPHALT.
<br />2. UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP
<br />SHALL BE RETURNED TO THE ORIGINATING BATCH PLANT
<br />FOR RECYCLING.
<br />3. HAND TOOLS INCLUDING, BUT NOT LIMITED TO, SCREEDS,
<br />SHOVELS, RAKES, FLOATS, AND TROWELS SHALL BE
<br />WASHED OFF ONLY INTO FORMED AREAS AWAITING
<br />INSTALLATION OF CONCRETE OR ASPHALT.
<br />WHEN NO FORMED AREAS ARE AVAILABLE, WASHWATER AND
<br />LEFTOVER PRODUCT SHALL BE CONTAINED IN A LINED
<br />CONTAINER. CONTAINED CONCRETE SHALL BE DISPOSED OF IN A
<br />MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE
<br />WATER QUALITY STANDARDS.
<br />SANITARY WASTEWATER:
<br />• PORTABLE SANITATION FACILITIES WILL BE FIRMLY SECURED,
<br />REGULARLY MAINTAINED, AND EMPTIED WHEN NECESSARY.
<br />• SOLID WASTE WILL BE STORED IN SECURE, CLEARLY MARKED
<br />CONTAINERS.
<br />OTHER:
<br />• OTHER BMPS WILL BE ADMINISTERED AS NECESSARY TO
<br />ADDRESS ANY ADDITIONAL POLLUTANT SOURCES ON SITE.
<br />CITY OF EVERETT GENERAL NOTES
<br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC)
<br />PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR
<br />DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES,
<br />RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES).
<br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE
<br />CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF
<br />THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
<br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED
<br />AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.
<br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS
<br />PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO
<br />CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO
<br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE
<br />PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE
<br />APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
<br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE
<br />CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING
<br />ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT
<br />AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM,
<br />ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
<br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
<br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
<br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED
<br />AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT
<br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE.
<br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND
<br />MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR
<br />CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS.
<br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED
<br />AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48
<br />HOURS FOLLOWING A MAJOR STORM EVENT.
<br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE
<br />ALLOWED TO ACCUMULATE WITHIN ATRAPPED CATCH BASIN. ALL
<br />CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO
<br />PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT
<br />LADEN WATER INTO THE DOWNSTREAM SYSTEM.
<br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED
<br />AT THE BEGINNING OF CONSTRUCTION AND
<br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
<br />MEASURES MAY BE REQUIRED TO ENSURE THAT
<br />ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE
<br />PROJECT.
<br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING
<br />TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE.
<br />11. APPROPRIATE MEASURES SHALL BETAKEN TO STOP SEDIMENT
<br />FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS
<br />FAIL. IF BMPS FAIL AND SEDIMENT -LADEN WATER IS LEAVING THE SITE,
<br />IMMEDIATELY NOTIFY YOUR PUBLIC WORKS INSPECTOR.
<br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED
<br />AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1
<br />THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1
<br />THROUGH SEPTEMBER 30.
<br />13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS
<br />PRIOR TO DEWATERING ACTIVITIES. HANDLE HIGHLY TURBID OR
<br />OTHERWISE CONTAMINATED DEWATERING WATER SEPARATELY FROM
<br />STORMWATER.
<br />14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP
<br />SHALL BE RETAINEDON SITE OR READILY AVAILABLE TO THE
<br />CONTRACTOR THROUGHOUT THE DURATION OF THE CONSTRUCTION
<br />PROJECT.
<br />15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE
<br />POLLUTION PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF
<br />POLLUTANTS.
<br />16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH
<br />INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT
<br />CONTROL BMPS ON PORTIONS OF THE SITE THAT DRAIN INTO THE LID
<br />BMPS.
<br />T.E.S.C. GENERAL NOTES
<br />THE NOTES AND DETAILS PROVIDED ON THIS SHEET ILLUSTRATE SOME OF
<br />THE MOST COMMON TEMPORARY EROSION/SILTATION CONTROL BEST
<br />MANAGEMENT PRACTICES (BMPs). ALTHOUGH SOME MEASURES SHOWN HERE
<br />MAY NOT BE SPECIFIED IN THE T.E.S.C. PLAN FOR THIS PROJECT, THE DETAILS
<br />ARE PROVIDED FOR FUTURE REFERENCE SHOULD SITE CONDITIONS REQUIRE
<br />ADDITIONAL MEASURES BEYOND THOSE SPECIFIED. APPROPRIATE
<br />RESPONSES TO UNANTICIPATED SITE CONDITIONS MAY INCLUDE, BUT ARE
<br />NOTLIMIjFrQpTW,KTFCTHJLLOWING ADDITIONAL BMPS:
<br />• TEMPORARY DITCHES, SWALES, DIKES OR BASINS
<br />• JUTE OR SYNTHETIC MATTING, EITHER GENERIC OR PROPRIETARY
<br />• SLOPE SCARIFICATION OR TERRACING
<br />• ANCHORED PLASTIC SHEETING
<br />• MULCH, BRUSH OR GRAVEL FILTER BERMS
<br />• DUST CONTROL
<br />• TIRE WASH STATIONS
<br />• SODDING
<br />• ROCK CHECK DAMS
<br />SUCH MEASURES SHALL BE SELECTED BY THE CONTRACTOR IN
<br />CONSULTATION WITH THE CITY INSPECTOR AND THE CESCL, AND SHALL BE
<br />INSTALLED PER MANUFACTURER'S SPECIFICATIONS, ENGINEER'S DESIGN OR
<br />STANDARD CONSTRUCTION INDUSTRY PRACTICE AS THE SITUATION DICTATES.
<br />1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE
<br />CONSTRUCTED PRIOR TO ANY GRADING OR LAND CLEARING IN
<br />ACCORDANCE WITH THE APPROVED TEMPORARY EROSION/SEDIMENTATION
<br />CONTROL PLAN. THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED
<br />UNTIL CONSTRUCTION AND LANDSCAPING IS COMPLETED AND THE
<br />POTENTIAL FOR ON -SITE EROSION HAS PASSED.
<br />2. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER
<br />QUALITY REQUIREMENTS, AND/OR CLEARING LIMITS MAY RESULT IN
<br />REVOCATION OF PROJECT PERMITS OR PLAN APPROVAL, FINES AND BOND
<br />FORECLOSURES.
<br />3. THE T.E.S.C. FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
<br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR PROVIDING IMPROVED OR MODIFIED
<br />FACILITIES AS NECESSARY TO MAINTAIN RUNOFF WATER QUALITY DURING
<br />AND AFTER SIGNIFICANT STORM EVENTS AND TO ADDRESS THE ACTUAL
<br />SITE AND SOILS CONDITIONS ENCOUNTERED.
<br />4. CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES SUFFICIENT
<br />QUANTITIES OF EROSION CONTROL MATERIALS TO COVER ALL EXPOSED
<br />SOIL IN THE EVENT OF UNANTICIPATED WEATHER CONDITIONS.
<br />CONTRACTOR MAY CONSIDER PHASING GRADING ON LARGE SITES TO
<br />MINIMIZE BARE SOIL EXPOSURE.
<br />5. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION,
<br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE T.E.S.C.
<br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL
<br />ALL CONSTRUCTION IS APPROVED. BARE AND/OR DISTURBED SOILS SHALL
<br />REMAIN UNCOVERED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1
<br />THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1
<br />THROUGH SEPTEMBER 30. STABILIZE WITH APPROVED T.E.S.C. METHODS
<br />(E.G. SEEDING, MULCHING, NETTING, EROSION BLANKETS, PLASTIC
<br />COVERING, ETC.). SOIL STOCKPILES SHALL BE STABILIZED WITHIN 24
<br />HOURS.
<br />6. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED,
<br />IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO INCHES.
<br />7. ANY AREA NEEDING T.E.S.C. MEASURES, NOT REQUIRING IMMEDIATE
<br />ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
<br />8. THE T.E.S.C. FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND
<br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS
<br />FOLLOWING A STORM EVENT.
<br />9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
<br />REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED
<br />OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED
<br />SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL
<br />AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED.
<br />10. CONTRACTOR SHALL USE INDUSTRY BEST MANAGEMENT PRACTICES TO
<br />PREVENT PETROLEUM PRODUCTS, FERTILIZERS, CONCRETE BY-PRODUCTS
<br />AND OTHER POLLUTANTS FROM ENTERING OFF -SITE DRAINAGE COURSES.
<br />SLASH PILES AND OTHER SOLID WASTE SHALL BE DISPOSED OF IN
<br />ACCORDANCE WITH ALL APPLICABLE LOCAL REGULATIONS.
<br />11. WASTEWATER FROM PROJECT ACTIVITIES AND DE -WATERING SHALL BE
<br />ROUTED TO AN UPLAND AREA FOR REMOVAL OF FINE SEDIMENTS AND
<br />OTHER CONTAMINANTS. ONLY CLEAN, UNPOLLUTED WATER SHALL LEAVE
<br />THE SITE.
<br />12. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY
<br />SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT
<br />PRIOR CITY OF EVERETT APPROVAL.
<br />CLEARING LIMITS
<br />CLEARING LIMITS SHOWN ON PLAN REPRESENT MAXIMUM ALLOWABLE
<br />EXTENT OF CLEARING ON THE PROPERTY. OWNER MAY ELECT TO CLEAR
<br />LESS AREA WITHIN WSDOT RIGHT-OF-WAY. DRAINAGE FACILITY DESIGN IS
<br />BASED ON ASSUMPTION OF MAXIMUM ALLOWED ONSITE CLEARING AND
<br />HARDSCAPE.
<br />MARKING OF CLEARING LIMITS AND PLACEMENT OF EROSION CONTROL
<br />BMPS IN THE FIELD SHALL BE ADJUSTED FOR ACTUAL EXTENT OF
<br />CLEARING AS DIRECTED BY OWNER. CLEARING LIMITS SHALL BE CLEARLY
<br />MARKED IN FIELD PRIOR TO COMMENCEMENT OF SITE WORK.
<br />UNDERGROUND UTILITY NOTE
<br />EX. UNDERGROUND UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON
<br />SURFACE INDICATORS. NO UNDERGROUND LOCATE SERVICE WAS
<br />UTILIZED FOR THEIR LOCATION. THE USE OF THIS MAP FOR THEIR EXACT
<br />LOCATION IS NOT WARRANTED. PRIOR TO CONSTRUCTION, USER SHOULD
<br />CALL THE UTILITY LOCATE SERVICE AT 1-800-424-5555, TWO BUSINESS
<br />DAYS BEFORE CONSTRUCTION.
<br />WATER QUALITY STANDARD
<br />STORMWATER RELEASED FROM THIS CONSTRUCTION SITE TO
<br />OFF -SITE DRAINAGE CHANNELS SHALL NOT BE PERMITTED TO
<br />TRANSPORT SEDIMENT LOADINGS EXCEEDING 5 NTUs ABOVE
<br />BACKGROUND LEVELS.
<br />EROSION CONTROL BMP'S
<br />HIGH VISIBILITY FENCING (BMP C103)
<br />USE IN COMBINATION WITH BMP C233, SILT FENCE AS INDICATED ON
<br />THE PLANS.
<br />CONSTRUCTION ROAD/PARKING AREA STABILIZATION (BMP C107)
<br />ONCE DEMOLITION IS COMPLETE, THE BUILDING FOUNDATIONS AND
<br />SLAB AREAS WILL BE STABILIZED WITH GRAVEL AND CONCRETE.
<br />TEMPORARY & PERMANENT SEEDING (BMP C120)
<br />PERMANENT SEEDING SHALL BE USED TO STABILIZE EXPOSED SOILS
<br />AND SHALL BE PERFORMED UNDER THE DIRECTION OF THE
<br />LANDSCAPE PLANS AND SPECIFICATIONS.
<br />MULCHING (BMP C121)
<br />STABILIZE EXPOSED SURFACES WITH 2"-4" MULCH WHEN SURFACES
<br />ARE TO BE UNWORKED FOR THE SEASONAL TIME FRAMES LISTED IN
<br />THE TESC NOTES AND SWPPP NARRATIVE.
<br />PLASTIC COVERING BMP C123
<br />USE PLASTIC SHEATHING TO PROTECT STOCKPILES. STABILIZE WITH
<br />SAND BAGS CONNECTED WITH ROPE.
<br />TOPSOILING/COMPOSTING (BMP C125)
<br />TOPSOIL EXPOSED SOILS AND PROPOSED PLANTERS.
<br />DUST CONTROL (BMP C140)
<br />CONTRACTOR SHALL IMPLEMENT MEASURES TO PREVENT WIND
<br />TRANSPORT OF DUST FROM SOIL SURFACES. SUCH MEASURES CAN
<br />INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: MULCHING AREAS
<br />NOT USED FOR VEHICLE ACCESS, SPRINKLING EXPOSED SURFACES
<br />WITH WATER, SURFACE HAUL ROADS WITH GRAVEL.
<br />STORM INLET PROTECTION (BMP C220)
<br />PLACE INSERTS PER PLAN DETAIL IN EXISTING CATCH BASINS AS
<br />INDICATED ON THE PLAN.
<br />AS NEW CATCH BASINS ARE INSTALLED, THESE SHALL ALSO BE
<br />PROTECTED UNTIL THE DRAINAGE AREA IS STABILIZED.
<br />SILT FENCE (BMP C233)
<br />INSTALL SILT FENCE IN LOCATIONS INDICATED ON THE PLAN.
<br />REVISIONS
<br />N N V Vol
<br />oD
<br />LV 0 N
<br />N a
<br />LU >_ N 0
<br />Z W
<br />_ N O
<br />�R
<br />V
<br />Z
<br />W N
<br />0
<br />W
<br />7
<br />N
<br />_o
<br />W cm>0
<br />as
<br />r3
<br />m
<br />J
<br />0�
<br />UW
<br />cc
<br />N tb
<br />r
<br />U
<br />W
<br />0Z
<br />c a r 0
<br />to a
<br />2z
<br />CC
<br />a
<br />� �
<br />W F
<br />¢ r
<br />Z W
<br />cr
<br />O W
<br />Z W
<br />3.
<br />0
<br />a
<br />DATE:
<br />4/4/24
<br />JOB #:
<br />24-033
<br />05.
<br />Know what's belOW.
<br />Call before you dig.
<br />C5.3