My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2024-10-25
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
ADMIN BLDG WEST
>
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 11:33:02 AM
Creation date
8/5/2024 10:36:48 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
ADMIN BLDG WEST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />2/2/2024 <br />2/2/2024 <br />BLDG 01- <br />Matt Schreifels <br />OTHER <br />eTRAKiT Inspection Request <br />CONSULTATION <br />Notes: <br />2/1/2024 5:56 AM Timothy Turcott <br />AM request of consultation to discuss framing/ sheetrock <br />Contact Name: Timothy Turcott <br />Site Address: 3000 ROCKEFELLER AVE 3RD FUR ADMIN WEST BLDG <br />Phone:2065738272 <br />e-Mail: tim.turcott@hotmail.com <br />3/12/2024 <br />3/12/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />PARTIAL <br />APPROVAL <br />Notes: <br />tim.turcott@bayley.net <br />From grid line 50 south. Ok to drywall one side. <br />FIRE 01- <br />3/14/2024 <br />13/14/2024 <br />CONSTRUCTION <br />BRONSON <br />APPROVAL <br />See notes <br />PEARSON <br />SAFETY INSPECTION <br />Notes: <br />3/13/2024 8:41 AM Timothy Turcott <br />Request any time before 2pm <br />Contact Name: Timothy Turcott <br />Site Address: 3000 ROCKEFELLER AVE 3RD FUR ADMIN WEST BLDG <br />Phone:2065738272 <br />e-Mail: tim.turcott@bayley.net <br />Reviewed plans with Tim, and discussed scope of work, exit signs, extinguishers, and relocation of fire alarm devices. <br />3/15/2024 <br />3/15/2024 <br />BLDG 10-DRYWALL <br />I Matt Schreifels <br />PARTIAL <br />eTRAKiT Inspection Request <br />NAILING <br />APPROVAL <br />Notes: <br />3/13/2024 8:40 AM Timothy Turcott <br />Request am <br />Contact Name: Timothy Turcott <br />Site Address: 3000 ROCKEFELLER AVE 3RD FUR ADMIN WEST BLDG <br />Phone:2065738272 <br />e-Mail: tim.turcott@bayley.net <br />One side drywall at east and south leg of hall/corridor and west wall of training room located in the north east corner of 3rd floor only. Ok to mud and <br />tape these locations. <br />3/21/2024 <br />3/21/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />CORRECTION <br />See Notes <br />REQUIRED <br />Notes: <br />3/19/2024 7:30 AM Timothy Turcott <br />Am request <br />Contact Name: Timothy Turcott <br />Site Address: 3000 ROCKEFELLER AVE 3RD FUR ADMIN WEST BLDG <br />Phone:2065738272 <br />e-Mail: tim.turcott@bayley.net <br />framing of monitor wall (furred walls along corridor), room 318 & elevator lobby need electrical rough in approval prior to building framing approval. <br />Once electrical has signed off for rough in approval in these areas reschedule framing inspection for approval. <br />�A_ <br />Printed: Wednesday, 24 July, 2024 2 of 7 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.