Laserfiche WebLink
Lz Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> BLDG 01- <br /> 2/2/2024 2/2/2024 CONSULTATION Matt Schreifels OTHER eTRAKiT Inspection Request <br /> Notes: <br /> 2/1/2024 5:56 AM Timothy Turcott <br /> AM request of consultation to discuss framing/sheetrock <br /> Contact Name:Timothy Turcott <br /> Site Address:3000 ROCKEFELLER AVE 3RD FLR ADMIN WEST BLDG <br /> Phone:2065738272 <br /> e-Mail:tim.turcott@hotmail.com <br /> 3/12/2024 3/12/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL <br /> APPROVAL <br /> Notes: <br /> tim.turcott@bayley.net <br /> From grid line 50 south.Ok to drywall one side. <br /> FIRE 01 BRONSON <br /> 3/14/2024 3/14/2024 CONSTRUCTION PEARSON APPROVAL See notes <br /> SAFETY INSPECTION <br /> Notes: <br /> 3/13/2024 8:41 AM Timothy Turcott <br /> Request any time before 2pm <br /> Contact Name:Timothy Turcott <br /> Site Address:3000 ROCKEFELLER AVE 3RD FLR ADMIN WEST BLDG <br /> Phone:2065738272 <br /> e-Mail:tim.turcott@bayley.net <br /> Reviewed plans with Tim,and discussed scope of work,exit signs,extinguishers,and relocation of fire alarm devices. <br /> 3/15/2024 3/15/2024 BLDG 10 DRYWALL PARTIAL <br /> Matt Schreifels eTRAKiT Inspection Request <br /> NAILING APPROVAL <br /> Notes: <br /> 3/13/2024 8:40 AM Timothy Turcott <br /> Request am <br /> Contact Name:Timothy Turcott <br /> Site Address:3000 ROCKEFELLER AVE 3RD FLR ADMIN WEST BLDG <br /> Phone:2065738272 <br /> e-Mail:tim.turcott@bayley.net <br /> One side drywall at east and south leg of hall/corridor and west wall of training room located in the north east corner of 3rd floor only.Ok to mud and <br /> tape these locations. <br /> CORRECTION <br /> 3/21/2024 3/21/2024 BLDG 08-FRAMING Matt Schreifels REQUIRED See Notes <br /> Notes: <br /> 3/19/2024 7:30 AM Timothy Turcott <br /> Am request <br /> Contact Name:Timothy Turcott <br /> Site Address:3000 ROCKEFELLER AVE 3RD FLR ADMIN WEST BLDG <br /> Phone:2065738272 <br /> e-Mail:tim.turcott@bayley.net <br /> framing of monitor wall(furred walls along corridor),room 318&elevator lobby need electrical rough in approval prior to building framing approval. <br /> Once electrical has signed off for rough in approval in these areas reschedule framing inspection for approval. <br /> • <br /> Printed: Friday,26 July,2024 2 of 7 <br /> SUPERION <br />