My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2024-10-25
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
ADMIN BLDG WEST
>
3000 ROCKEFELLER AVE ADMIN BLDG WEST 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 11:33:02 AM
Creation date
8/5/2024 10:36:48 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
ADMIN BLDG WEST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARRINGTON AIR QUALITY SERVICES <br /> Ex cutiv Summary <br /> 1) General Information <br /> a) This report is based on actual field readings taken during operation unless otherwise noted. <br /> Work was completed on: 06/17/24 <br /> b) Equipment is inspected for proper and safe operation unless noted in this summary or the <br /> associated data contain herein <br /> c) Work requiring adjustments will be performed to+/-10%of the design value unless other <br /> specifications require increased/decreased tolerances and approval by the Engineer of <br /> Record (EOR)or Authority Having Jurisdiction (AHJ). Flow rates were measured with <br /> calibrated instruments and are listed on the tool summary <br /> d) All suggestions to further improve performance or function need to be fully vetted and <br /> verified by all interested parties(i.e. Engineer, Owner,Tenant, Contractor) <br /> e) Deficiencies noted throughout this report are the responsibility of the parties having an <br /> interest in them and are not to be corrected by the TAB team unless instructed in the <br /> contract documents. Notes are added for clarification as applicable <br /> f) Design information is drawn from various sources to include, but not limited to: Drawings, <br /> specifications, user manuals,shop drawings,submittals,service history, legacy documents, <br /> and oral & photographic information.Additionally, unspecified values may be field <br /> determined as required in the absence of engineered values, based on current best <br /> practices <br /> 2) Scope of the Project <br /> a) Inspection of mechanical equipment for proper installation and safe operation <br /> b) Verify airflows/water flows and offer suggestions as required <br /> c) Correct any deficiencies if possible <br /> d) Provide the owner with a certified TAB report demonstrating the actual airflow <br /> 3) System Description <br /> a) Thirty(30) dual duct variable air volume terminal units served by existing Built-up air <br /> handling unit <br /> b) Bathroom ceiling exhaust fans controlled by local disconnect <br /> 4) Findings <br /> a) All systems operate as designed and were set within design tolerance <br /> b) Exhaust fan speeds were set using installed speed potentiometer <br /> c) Any deficiencies will be attached to Tab report <br />
The URL can be used to link to this page
Your browser does not support the video tag.