My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
>
Address Records
>
ROCKEFELLER AVE
>
2611
>
ROCKEFELLER SQUARE 2
>
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 8:26:35 AM
Creation date
8/5/2024 11:06:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2611
Tenant Name
ROCKEFELLER SQUARE 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This operation and Maintenance manual shall be a guideline for maintaining the <br /> stormwater conveyance system onsite and shall be kept onsite as all times by the current <br /> owner of the property. <br /> The owner of the property shall be responsible for inspecting and maintaining the <br /> stormwater system for the property in accordance with this manual and keep a record of the <br /> said inspections/maintenance on the property. All maintenance and inspection records <br /> shall be transferred to any new owner of the property. <br /> Please see the enclosed sheets for an approximate inspection schedule for each of the <br /> components of the stormwater system. Inspect the system yearly or as needed to maintain <br /> proper service of the stormwater system. <br /> Insight Engineering Co. -Stormwater Site Plan 12/30/2020 <br /> - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.