Laserfiche WebLink
I <br /> I SECTION VIII: PERMANENT STORMWATER CONTROL PLAN <br /> I <br /> A. OFF-SITE ANALYSIS <br /> IA site reconnaissance was performed by Brian Kalab of Insight engineering on <br /> December Pt, 2019 to verify the downstream flow paths and observe any drainage <br /> Iproblems downstream of the site. The sky was partly cloudy and overcast with a <br /> temperature of 45 degrees. <br /> IThe site is currently developed with four residential homes. The site contains one <br /> drainage that slopes to the slightly to the east. There are no critical areas located within the <br /> Isite. Per NRCS survey of Snohomish County, the project site contains Alderwood soils that <br /> have a hydrologic classification of Type "C". No visible on-site drainage problems were <br /> Iobserved at the time of field investigations. <br /> Upstream Analysis <br /> IBased on the site reconnaissance and the topographic survey of the site, the off-site <br /> area entering the site is very minimal. Refer to the Downstream Analysis Map attached in <br /> Ithe next page for more details. <br /> Downstream Analysis <br /> 1 The site contains one drainage basins that slopes slightly to west. The runoff from <br /> the site flows to the west and enters the existing combined storm and sanitary sewer system <br /> Ialong alley in between Rockefeller Ave and Oakes Ave. The flow travels east beneath <br /> Everett Ave for approximately 685 feet through 10, 15, and 18-inch pipes. The flows <br /> Icontinue east to cross Broadway and enter a 36 inch brick system. <br /> This is where the drainage analysis was completed. There did not appear to be any <br /> Irestrictions or erosion problems within 1 mile of the site. <br /> In the mitigated state the runoff from the site will be connected to the existing storm <br /> Iand sanitary sewer system on the eastern portion of the property. The flow is minimal and <br /> therefore the downstream channel should not experience any problems in the future. <br /> I <br /> I <br /> I Insight Engineering Co. -Stormwater Site Plan 12/30/20 <br /> - <br />