Laserfiche WebLink
1 <br /> B. PRE-DEVELOPED HYDROLOGY <br /> 1 <br /> The site is currently developed with four residential homes. The site contains one drainage <br /> 1 that slopes to the slightly to the east. There are no critical areas located within the site. Per <br /> NRCS survey of Snohomish County, the project site contains Alderwood soils that have a <br /> hydrologic classification of Type"C". <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 Insight Engineering Co. -Stormwater Site Plan 12/30/20 <br /> - <br /> 1 <br />