My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/08/07 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/08/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 8:47:27 AM
Creation date
8/8/2024 8:45:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
State of Washington Department of Ecology <br />City of Everett <br />Port Gardner Bay Outfalls Water Quality Treatment Retrofit Project <br />Agreement No. WQC-2019-EverPW-00052 <br />Page 7 of 9 <br />CHANGES TO SCOPE OF WORK <br />Task Number:3 Task Cost: $74,546.41 <br />Task Title:Construction Management <br />Task Description: <br />A. The RECIPIENT will provide construction oversight and management of the project . <br />B. The RECIPIENT will submit a detailed construction quality assurance plan to ECOLOGY for review and acceptance <br />before the start of construction. This plan must describe how the RECIPIENT will perform adequate and competent <br />construction oversight. Once accepted by Ecology, upload to EAGL. <br />C. The RECIPIENT will conduct a pre-construction conference meeting and invite ECOLOGY to attend . <br />D. The RECIPIENT will submit an updated project schedule with projected cash flow to ECOLOGY within 30 days of the <br />start of construction. The RECIPIENT will revise and/or update the project schedule whenever major changes occur and at a <br />minimum of every three months. The RECIPIENT will submit the updated schedule to ECOLOGY with the quarterly report . <br />When changes in the construction schedule affect previous cash flow estimates , The RECIPIENT must submit revised cash <br />flow projections to ECOLOGY. <br />E. Prior to execution, the RECIPIENT will submit in writing any eligible change orders that are a significant deviation from <br />ECOLOGY-accepted plans and specifications for ECOLOGY review and acceptance for payment . ECOLOGY must review <br />and accept all change orders that impact grant eligible activities prior to implementation. ECOLOGY must review all other <br />change orders for technical merit and should be submitted within 30 days after execution. Change orders are to be signed by <br />the contractor, the engineer (if appropriate), and the RECIPIENT prior to submittal to ECOLOGY for acceptance. <br />F. The RECIPIENT will operate and maintain the constructed facility for the design life of the facility . Additionally, the <br />RECIPIENT will develop and submit an operations and maintenance (O&M) plan for all Water Quality Best Management <br />Practices to ECOLOGY for review. The O&M plan will describe how the RECIPIENT will ensure project success consistent <br />with the design manual used. The O&M plan must also address long-term activities to assure ongoing pollutant removal and <br />flow-control capability of the project in accordance with the design manual. <br />G. Upon completion of construction, the RECIPIENT will provide to ECOLOGY: <br />1. A Stormwater Construction Completion Form signed by a professional engineer indicating that the project was completed <br />in accordance with the plans and specifications and major change orders approved by ECOLOGY’s Project Engineer and <br />shown on the Record Drawings. The Stormwater Construction Completion Form can be found on the ECOLOGY website . <br />2. GIS compatible project area in Shapefile, Geodatabase file, or ECOLOGY-Approved Equivalent. The project area should <br />include features for treatment facilities and contributing areas. <br />Template Version 10/30/2015
The URL can be used to link to this page
Your browser does not support the video tag.