My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2615 BROADWAY 2023 QFC Plans 2024-08-19
>
Address Records
>
BROADWAY
>
2615
>
QFC
>
Plans
>
2615 BROADWAY 2023 QFC Plans 2024-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 2:47:17 PM
Creation date
8/19/2024 2:37:34 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2615
Tenant Name
QFC
Permit
B2307-041
Year
2023
Notes
ROOF RECOVER (1) LAYER OF 60MIL TPO OVER FIRE RATED BASE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2615 BROADWAY • <br /> EVERETT, WA 98201 <br /> Rainbow Federal, Inc. conducted a site visit where we took measurements of the building, noted wall heights, lineal <br /> feet of curbs, number of penetrations and any irregular conditions. He reported that the structure was sound and <br /> he did not find any areas that were"soft" or that would need to be replaced. <br /> A core cut sample was taken from the roof to determine the existing roof system. There is one (1)existing Built-Up <br /> asphalt roof system,'A" perlite cover board,3"of insulation and a rosin paper separator sheet all over a plywood <br /> roof deck. The entire existing roof system measures 4"thick. <br /> /11 <br /> t � 01 <br /> y'. <br /> 'y <br /> r <br /> He noted any non-typical conditions that would need specific detailing,which are as follows: <br /> • Steel structures that the larger units sit on. Some have less clearance above the existing roof than others. <br /> They all have posts that penetrate the roofing that will need to be roofed in watertight. <br /> • <br /> .` z,•.. - e""-'� -- -_.i _. • <br /> -741 <br /> _ <br /> • A portion of the front wall has asphalt shingles installed. Where the new TPO membrane meets this <br /> condition,it will need to be tied in correctly to make it watertight. <br /> •� fly _ <br /> l I t <br />
The URL can be used to link to this page
Your browser does not support the video tag.