Laserfiche WebLink
Ein)CITY OF EVERETT <br /> EVERETT Permit Services - July � � ° 111) <br /> 1E [1V23 <br /> CITY OF EVERETT <br /> WASHINGTON Permit Spr Vfr es <br /> May 17, 2023 06.21.2023 <br /> CORRECTION LETTER REPSONSES <br /> Bobby Vang <br /> Ware Malcomb <br /> 3015 112th Avenue NE, Suite 205 <br /> Bellevue, WA 98004 <br /> Email Address: bvang@waremalcomb.com <br /> RE: Owner: Powdermill Phase 1, LLC <br /> Job Address: 6307 36th Avenue W, Building C <br /> Plan Check Number: B2304-096, First Building Review <br /> Hello, Bobby. <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following review comments reference the Everett Municipal Code <br /> (EMC), the 2018 International Building Code (IBC), the 2018 International Existing Building Code <br /> (IEBC), 2018 the Washington State Energy Code (WSEC), and the 2018 International Mechanical <br /> Code (IMC). Additional reference standards are listed in IBC Chapter 35. Amendments to the <br /> adopted building codes by Washington Administrative Code (WAC) Title 51 are incorporated into <br /> the referenced code citations. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Geotechnical <br /> Page 1 of 3 <br />