Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' E2311-198 Description: Cable installation for large equipment at Boeing <br /> Applied: 11/22/2023 Approved: 11/22/2023 Site Address: 3003 W CASINO RD BLDG 40-23 <br /> Issued: 11/22/2023 Finaled: 7/3/2024 City,State Zip Code: EVERETT,WA 98204-1910 <br /> Status: FINALED Applicant: PHASE 3 ELECTRIC LLC <br /> Parent Permit: Owner: BOEING COMPANY <br /> Parent Project: Contractor: PHASE 3 ELECTRIC LLC <br /> Details: <br /> 4 Cells at Boeing for Tooling <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION EXTENSION <br /> 4/24/2024 4/24/2024 (REASON AUDREY ARBOW APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:Ryan Mott<ryanm@phase3electric.com> <br /> Sent:Wednesday,April 24,2024 8:34 AM <br /> To: E Trakit(PW)<ETrakit@everettwa.gov> <br /> Cc:Garrett S<garretts@phase3electric.com>;Jason Sloane<jasons@Electroimpact.com>;Trevor W<trevorw@phase3electric.com>;Sarah Mott <br /> <Sarahm@phase3electric.com> <br /> Subject:[EXTERNAL] E2311-198 Permit extension for Boeing Project. <br /> Good Morning, <br /> It looks like our permit expires soon on this permit.We will need to extend it until July.This is a larger project and won't be finished until then. <br /> Please advise on what we will need to do. <br /> Thank You! <br /> Ryan <br /> E2311-198 <br /> Ryan Mott <br /> 0:(425)505-5596 <br /> D:(360)467-6227 EXT 47111 <br /> Phase3electric.com <br /> 7/3/2024 7/3/2024 ELEC 10-FINAL** MICHAEL PARTIAL <br /> WICKLANDER APPROVAL <br /> Notes: <br /> Inspection was intended to run concurrent with the line voltage,Dalton E2308-065,inspection. <br /> This inspection is finaled for cell's 9&10 <br /> I <br /> Printed:Tuesday,20 August,2024 1 of 1 rk <br /> SUPERION <br />