Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 2/23/2024 2/23/2024 (REASON GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:Jeremy Lum<jeremyl@precisionelectricgroup.com> <br /> Sent:Thursday,February 22,2024 12:32 PM <br /> To:Sharon Gilfeather<SGilfeather@everettwa.gov> <br /> Subject:RE:External Email [EXTERNAL]City of Everett eTRAKiT Contact Form <br /> Hi Sharon, <br /> I'm monitoring the electrical permits for the ongoing construction project at 215 Shuksan Way and need the following permits to get extended.What <br /> would you need from me to extend these expiration dates? <br /> E2210-076 <br /> E2301-106 <br /> E2301-107 <br /> E2302-144 <br /> E2302-145 <br /> E2302-146 <br /> E2302-147 <br /> E2302-148 <br /> E2304-084 <br /> E2306-148 <br /> E2309-228 <br /> Thanks, <br /> Jeremy Lum <br /> Precision Electric Group Inc. <br /> 15301 NE 90th Street,Suite 150,Redmond WA 98052 <br /> www.precisionelectricgroup.com <br /> jeremyl@precisionelectricgroup.com/206.584.6847 <br /> MAILING ADDRESS: <br /> Precision Electric Group,Inc. <br /> 2361 La Mirada Dr <br /> Vista,CA 92081 <br /> 3/6/2024 3/6/2024 ELEC 10-FINAL** MICHAEL NOT READY eTRAKiT Inspection Request <br /> WICKLANDER <br /> Notes: <br /> 2/29/2024 9:42 AM PRECISION ELECTRIC GROUP INC <br /> FINAL <br /> Contact Name:PRECISION ELECTRIC GROUP INC <br /> Site Address:215 SHUKSAN WAY <br /> Phone:4258238600 <br /> e-Mail:STEVEM@precisionelectricgroup.com <br /> Make Safe any and all electrical equipment and associated wiring,;ensure all egress pathway lighting is installed,&operating normal;install all required <br /> exit signs and emergency lighting per IBC <br /> Install all required lighting for the electrical rooms and closets. <br /> Any temporary equipment installed shall be of permanent wiring methods. <br /> In the process of demo. <br /> I <br /> Printed:Wednesday, 21 August, 2024 4 of 5 rk <br /> SUPERION <br />