My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 8/13/2024 Amendment 4
>
Contracts
>
6 Years Then Destroy
>
2024
>
Washington State Department of Ecology 8/13/2024 Amendment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 2:09:44 PM
Creation date
8/22/2024 2:09:32 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
8/13/2024
Council Approval Date
8/7/2024
End Date
6/30/2024
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Port Gardner Bay Outfalls Water Quality Treatment Retrofit
Public Works WO Number
UT3701
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Tracking Number
0001877
Total Compensation
$34,753.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 5 of 11State of Washington Department of Ecology <br />City of Everett <br />Port Gardner Bay Outfalls Water Quality Treatment Retrofit Project <br />Agreement No. WQC-2019-EverPW-00052 <br />2. 90 Percent Design Package. At a minimum, this package must include 90 percent plans, specifications, engineer’s opinion <br />of cost which includes a schedule of eligible costs, and project construction schedule. For current bid inserts and specifications <br />refer to the ECOLOGY website. <br />The RECIPIENT agrees to respond to ECOLOGY comments. The RECIPIENT must receive an Ecology 90 Percent Design <br />Acceptance Letter prior to proceeding Final Design. <br />3. The RECIPIENT will submit a digital copy of the Final Bid Package to ECOLOGY for review and acceptance prior to <br />advertising the project. The Final Bid Package includes: project plans, specifications, engineer’s opinion of cost including a <br />schedule of eligible costs, and project construction schedule. <br />Task Goal Statement: <br />The RECIPIENT will complete all design, environmental review, and permitting tasks and respond to ECOLOGY comments in <br />a timely manner. <br />Task Expected Outcome: <br />The project will meet the requirements set forth by the State Environmental Policy Act , cultural resource protection <br />requirements, ECOLOGY water quality facility design standards, and all other applicable federal, state, and local laws and <br />regulations. <br />Deliverables <br />Due DateDescriptionNumber <br />2.1 Copy of SEPA determination documentation . Upload to EAGL and <br />notify Ecology when upload is complete. <br />2.2 Submit ECOLOGY 05-05/106 Form and any supplemental cultural <br />resources documentation including Cultural Resource surveys directly to <br />the Ecology Project Manager. Upload the Final Determination Letter to <br />EAGL. <br />2.3 Inadvertent Discovery Plan. Upload to EAGL and notify Ecology when <br />upload is complete. <br />2.4 Design Report. Upload to EAGL and notify Ecology when upload is <br />complete. <br />2.5 Responses to Ecology Design Report Comments. Upload to EAGL and <br />notify Ecology when upload is complete. <br />2.6 Ecology Design Report Acceptance Letter . Upload to EAGL and notify <br />Ecology when upload is complete. <br />2.7 90 Percent Design Package. Upload to EAGL and notify ECOLOGY <br />when upload is complete. <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 1D482E26-3590-4D01-B56E-D1E3F3905AC2
The URL can be used to link to this page
Your browser does not support the video tag.