My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lightform Films 8/22/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Lightform Films 8/22/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:29:20 PM
Creation date
8/23/2024 1:29:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lightform Films
Approval Date
8/22/2024
End Date
11/21/2024
Department
Police
Department Project Manager
Tracey Landry
Subject / Project Title
Police Recruitment Videos
Tracking Number
0004480
Total Compensation
$5,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> <br /> <br />PROFESSIONAL SERVICES AGREEMENT <br /> <br />This Professional Services Agreement (“Agreement”) is effective as of the date of last <br />signature below and is between the City of Everett, a Washington municipal corporation (the <br />“City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). This <br />Agreement is for the purpose of the Service Provider providing services as set forth in this <br />Agreement. This Agreement includes the Basic Provisions, the attached General Provisions, and <br />the scope of work attachment, if any, referenced in the Basic Provisions. <br />BASIC PROVISIONS <br />Service Provider <br />Lightform Film <br />20815 25th Ave S <br />SeaTac, WA 9819 <br />contact@lightformfilm.com <br />City Project <br />Manager <br />Doug Jackson <br />City of Everett -- Police Department <br />3002 Wetmore Ave <br />Everett, WA 98201 <br />djackson@everettwa.gov <br />Scope of Work <br />(must select one) <br />☐ Scope of Work is attached. One sentence summary of scope of work <br />is as follows Enter text <br /> ☒ Scope of Work is not attached. Instead, the Scope of Work is as <br />follows: 3 Recruiting videos. (1) 1-2.5-3.5 min. (2) 1-30 sec. (3) 1-15 sec. <br />Final videos must be acceptable to the City Project Manager. These <br />videos will be made from previously recorded video footage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.