My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACE Engineers Inc. 8/22/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
PACE Engineers Inc. 8/22/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:31:50 PM
Creation date
8/23/2024 1:31:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
PACE Engineers Inc.
Approval Date
8/22/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Sabina Araya
Subject / Project Title
Add Restroom Building Bid-Ready Design and add Project Management
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004278
Total Compensation
$83,047.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Pace Engineers, Inc. 4/1/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WATER | L AND | I NFRASTRUCTURE | F ACILITIES <br /> <br />11255 Kirkland Way, Suite 300 <br />Kirkland, Washington 98033-3417 <br />425.827.2014 <br />July 22, 2024 <br /> <br /> <br />Sabina Arays <br />IT Project Manager - Transit <br />Everett Transit <br />2930 Wetmore Avenue, Suite 6A <br />Everett, Washington 98201 <br />Subject: Everett Transit – Everett Mall Bus Platform <br />Supplement No. 1 - Restroom Building <br />PACE Project No. 24462 <br /> <br />Dear Sabina: <br />The subject contract is herein amended to incorporate the following scope of services: <br />SCOPE OF SERVICES <br />Task 1 – Project Management (Supplement) <br />Due to extra coordination efforts and the addition of the design of a restroom building, <br />project management budget will be increased by $6,000.00 <br />Task 14 – Restroom Building Bid-Ready Design (TCF) <br />TCF Architecture will lead the design effort of a 300-square-foot restroom building with <br />two (s) separated restrooms, breakroom, utility closet and integration with the transit <br />platform for full scope of services refer to TCF July 19, 2024, proposed letter attached. TCF <br />fee $66,998.00, with PACE 15% markup, $77,047 <br />I. FEE <br />Client agrees to pay PACE for the above services on the basis of a fixed fee of $83,047, <br />plus reimbursable expenses as set forth in the prime contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.