My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACE Engineers Inc. 8/22/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
PACE Engineers Inc. 8/22/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:31:50 PM
Creation date
8/23/2024 1:31:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
PACE Engineers Inc.
Approval Date
8/22/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Sabina Araya
Subject / Project Title
Add Restroom Building Bid-Ready Design and add Project Management
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004278
Total Compensation
$83,047.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Pace Engineers, Inc. 4/1/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PACE Engineers - Everett Transit EXHIBIT A <br />Everett Mall Bus Platform – Restroom Building <br />Page 2 of 3 <br /> <br /> <br />124 North I Street Tacoma, Washington 98403 P.253.572.3993 www.tcfarchitecture.com <br /> Specifications: Provide 3-part CSI technical specifications for architectural, structural, and MEP building <br />systems to be included in the overall Project Manual. PACE ENGEINEERS will be responsible for all other <br />portions of the Project Manual. Specifications to be provided in WORD and .pdf format. <br />Building Permitting <br /> Building Plan Review Coordination: TCF will provide a building related permit submittal package of <br />documents to PACE ENGEINEERS for PACE ENGEINEERS to submit to the AHJ for Plan Review. TCF will be <br />available for telephone and e-mail communication with the AHJ’s Plan Reviewers and other staff as needed <br />to answer questions. <br /> Submittal Documents: Anticipated building permit documentation provided under this proposal includes <br />Architectural drawings, structural foundation drawings, HVAC, Plumbing and Electrical drawings, structural <br />calculations, NREC energy code forms, and building permit applications. <br /> Plan Review/Permit Fees: TCF shall not be responsible for any plan review or permit fees. <br />Meetings / Conference Calls <br /> Owner and PACE ENGEINEERS: TCF will meet with Everett Transit and PACE ENGEINEERS as needed to <br />review the design. After receiving comments from Everett Transit and PACE ENGEINEERS, TCF will adjust as <br />needed to incorporate comments. TCF assumes all meetings will be virtual. <br />Renderings <br /> Following design updates, TCF will provide up to (2) 3D color renderings of the exterior of the building. <br />BIDDING AND CONSTRUCTION SUPPORT <br /> Bidding: Provide support to PACE ENGINEERS and Everett Transit for bidding services related to the <br />restroom building to include substitution review, question and answer and other applicable items. <br /> Construction: Provide support to PACE ENGINEERS and Everett Transit for construction services related to <br />the restroom building to including responses to submittals, RFI, ASI. Review applicable cost changes and <br />other applicable items. <br /> <br />Assumptions <br />x PACE ENGEINEERS is the prime consultant and TCF is a sub to PACE ENGEINEERS. TCF will bring on MEP, <br />structural and Hardware sub consultants. <br />x Site design, landscaping, site lighting, geotechnical studies and other non-building related items will be <br />provided by PACE ENGEINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.