Laserfiche WebLink
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Amendment 2 of the Professional Services Agreement with Otak for Water Main <br />Replacement Y, Phase 2 <br />Council Bill # interoffice use <br /> <br />Project: Water Main Replacement Y, Phase 2 Partner/Supplier: Otak <br /> Location: I-5 Bridge from E Grand to 4th Street SE <br />Preceding action: PSA 4/19/2023, Plans and Systems Ordinance 8/7/24 <br />Fund: 336 - Water & Sewer System Improvement Fund <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 8/14/24 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />PSA Amendment <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Souheil Nasr <br /> <br />Phone number: <br />425-257-7210 <br /> <br />Email: <br />snasr@everettwa.gov <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The funding source for this project is Fund 401 Water and Sewer Utility Fund. The <br />programmed available funding is $2,333,000. <br /> <br />Project summary statement: <br />This project will install a new water main to replace and upsize an existing water main, <br />including an 800 ft section suspended from I-5 bridge, that has a high consequence of <br />failure, and recently prone to breaks. The upgrade will ensure reliability of water service <br />for existing customers and future development, and that adequate fire flow, per the <br />2020 Comprehensive Water Plan, is provided. <br />After 60% design was completed, the decision was made to split the Water Main <br />Replacement “Y” into two phases, because the nature of the work for Phase 2 is <br />significantly different than Phase 1. This amendment adds the work to complete the <br />Phase 2 final design and bid package, modifying design plans to meet WSDOT <br />requirements, and adds the task of services during construction for Phase 2 of the <br />project. <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 2 to the PSA with Otak for Water Main <br />Replacement Y, Phase 2 in the amount of $61,312. <br />