Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />BLDG 05- <br />3/18/2024 <br />3/18/2024 <br />UNDERFLOOR <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />FRAMING <br />REQUIRED <br />Notes: <br />3/15/2024 9:51 AM SEID ALI <br />please give me a call an hour before <br />Contact Name: SEID ALI <br />Site Address: 2132 HIGHLAND AVE <br />Phone:2062617592 <br />e-Mail: seidali99@gmail.com <br />Contact Name: SEID ALI <br />Site Address: 2132 HIGHLAND AVE <br />Phone:2062617592 <br />e-Mail: seidali99@gmail.com <br />Joists over span. Owner adding additional joist to reduce spacing from 24" to 12". Span length for 2x6 at 12" o.c. Equals 10'-9" per irc table r502.3.1(2). <br />Owner adding additional supports at location of plumbing and other areas. Missing plate to slab connection. Ok to install rigid insulation. Do not cover <br />floor framing. Need plumbing permit. <br />BLDG 05- <br />3/19/2024 <br />3/19/2024 <br />UNDERFLOOR <br />RAKEEB KHAN <br />PARTIAL <br />eTRAKiT Inspection Request <br />APPROVAL <br />FRAMING <br />Notes: <br />3/18/2024 5:02 PM SEID ALI <br />Please call me at 206-261-7592 before heading there <br />Contact Name: SEID ALI <br />Site Address: 2132 HIGHLAND AVE <br />Phone:2062617592 <br />e-Mail: seidali99@gmail.com <br />Leave area where plumbing is located exposed. All other new floor in garage conversion is ok to cover <br />3/19/2024 <br />T3/19/2024 <br />BLDG 12- <br />RAKEEB KHAN <br />PARTIAL <br />INSULATION <br />APPROVAL <br />Notes: <br />R-10 on existing slab in garage conversion. <br />BLDG 05- <br />5/14/2024 <br />5/14/2024 <br />UNDERFLOOR <br />RAKEEB KHAN <br />APPROVAL <br />FRAMING <br />Notes: <br />Garage conversion area floor only. Owner to add blocking between joists as discussed. <br />6/6/2024 <br />6/6/2024 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />Ceiling framing located above the kitchen island requires engineering. Ceiling joist are supporting new mechanical unit. <br />Ok to drywall mud and tape walls on main floor. Do not cover any walls in garage conversion. Garage conversion is not ready and needs all sub permit <br />rough in approval prior to framing. Do not insulate attic above kitchen island until attic framing is approved. <br />I <br />Printed: Friday, 23 August, 2024 2 of 5 rk <br />SUPERION <br />