Laserfiche WebLink
N <br />9 <br />OPTION: STOCKPILE EXISTING TOPSOIL <br />STOCKPILE EXISTING TOPSOIL DURING GRADING. STOCKPILE AND COVER SOIL <br />WITH WEED BARRIER MATERIAL THAT SHEDS MOISTURE YET ALLOWS AIR <br />TRANSMISSION, IN APPROVED LOCATION, PRIOR TO GRADING. REPLACE <br />STOCKPILED TOPSOIL PRIOR TO PLANTING. STOCKPILED TOPSOIL SHALL BE <br />TESTED AND AMENDED IF NEEDED TO MEET THE ORGANIC MATTER OR <br />DEPTH REQUIREMENTS EITHER AT PREAPPROVED RATE OR CALCULATED <br />RATE. ALL SOIL AREAS DISTURBED OR COMPACTED DURING CONSTRUCTION, <br />AND NOT COVERED BY BUILDINGS OR PAVEMENT, SHALL BE AMENDED WITH <br />COMPOST AS DESCRIBED BELOW. <br />1. SCARIFICATION: IF PLACED TOPSOIL PLUS COMPOST OR OTHER <br />ORGANIC MATERIAL WILL AMOUNT TO LESS THAN 12 INCHES, SCARIFY <br />OR TILLSUBGRADE TO DEPTH NEEDED TO ACHIEVE 12 INCHES OF <br />LOOSENED SOIL AFTER TOPSOIL AND AMENDMENT ARE PLACED. <br />ENTIRE SURFACE SHOULD BE DISTURBED BY SCARIFICATION. DO NOT <br />SCARIFY WITHIN DRIP LINE OF EXITING TREES TO BE RETAINED. <br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOT <br />COMPOST -AMEND SOILS WITHIN 3 FEET ON CENTER OF UTILITY <br />INFRASTRUCTURE (POLES, VAULTS, METERS ETC.). WITHIN ONE FOOT <br />OF PAVEMENT EDGE, CURBS AND SIDEWALKS; SOIL SHOULD BE <br />COMPACTED TO APPROXIMATELY 90% MAX. MODIFIEDPROCTOR <br />DENSITY (A5TM D1557) TO ENSURE A FIRM SURFACE. DO NOT <br />COMPACT WITHIN TREE PROTECTION ZONE. <br />OPTION: AMEND EXISTING TOPSOIL <br />AMEND EXISTING SITE TOPSOIL, OR SUBSOIL, EITHER AT PREAPPROVED RATE <br />OR AT CALCULATED RATE BASED ON TESTS OF THE SOIL AND AMENDMENTS. <br />ALL SOIL AREAS DISTURBED OR COMPACTED DURING CONSTRUCTION AND <br />NOT COVERED BY BUILDINGS OR PAVEMENT, SHALL BE AMENDED WITH <br />COMPOST AS DESCRIBED BELOW. <br />1. SCARIFICATION; SCARIFY OR TILL SUBGRADE TO 8 INCHES DEPTH (OR <br />TO DEPTH NEEDED TO ACHIEVE A TOTAL DEPTH OF 12 INCHES OF <br />UNCOMPACTED SOIL AFTER CALCULATED AMOUNT OF AMENDMENT IS <br />ADDED). ENTIRE SURFACE SHOULD BE DISTURBED BY SCARIFICATION. <br />DO NOT SCARIFY WITHIN DRIP LINE OF EXISTING TREES TO BE RETAINED <br />OR WHERE SCARIFICATION WOULD DAMAGE TREE ROOTS OR AS <br />DETERMINED BY THE ENGINEER. <br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOT COMPOST -AMEND <br />SOILS WITHIN 3 FEET ON CENTER OF UTILITY INFRASTRUCTURE (POLES, <br />VAULTS, METERS ETC.). WITHIN ONE FOOT OF PAVEMENT EDGE, <br />CURBS AND SIDEWALKS; SOIL SHOULD BE COMPACTED TO <br />APPROXIMATELY 90% MAX. MODIFIED PROCTOR DENSITY (ASTM <br />D1557) TO ENSURE A FIRM SURFACE. DO NOT COMPACT WITHIN TREE <br />PROTECTION ZONE. <br />3"-4" (SETTLED} ARBORIST <br />WOOD CHIP MULCH <br />3" OF COMPOST <br />INCORPORATED INTO i <br />5" OF SITE SOIL (TOTAL <br />AMENDED DEPTH OF <br />9.5", FOR A SETTLED <br />DEPTH OF 8") <br />SUBSOIL SCARIFIED 4" <br />BELOW COMPOST <br />AMENDED LAYER (12" <br />BELOW SOIL SURFACE) <br />PLANTING BEDS <br />1. PREAPPROVED RATE: PLACE 3 INCHES OF <br />COMPOSTED MATERIAL AND ROTOTILL INTO 5 <br />INCHES OF EXISTING SITE SOILS (A TOTAL <br />AMENDED DEPTH OF ABOUT 9.S INCHES, FOR A <br />SETTLED DEPTH OF 8 INCHES). <br />2. CALCULATED RATE: PLACE CALCULATED <br />AMOUNT OF COMPOSTED MATERIAL OR <br />APPROVED ORGANIC MATERIAL AND ROTOTILL <br />INTO DEPTH OF SOIL NEEDED TO ACHIEVE 8 <br />INCHES OF SETTLED SOIL AT 10% ORGANIC <br />CONTENT. <br />3. RAKE BEDS TO SMOOTH AND REMOVE SURFACE <br />ROCKS LARGER THAN 2 INCHES DIAMETER. <br />MULCH PLANTING BEDS WITH 3"-4" OF ORGANIC <br />MULCH OR STOCKPILED DUFF. <br />0" <br />12" <br />-- j <br />GRASS SEED OR SOD <br />1.7S" OF COMPOST <br />INCORPORATED INTO <br />6.2S" OF SITE SOIL <br />(TOTAL AMENDED <br />DEPTH OF 9.5", FOR A <br />SETTLED DEPTH OF 8") <br />SUBSOIL SCARIFIED 4" <br />BELOW COMPOST <br />AMENDED LAYER (12" <br />BELOW SOIL SURFACE) <br />TURF (LAWN) AREAS <br />1. PREAPPROVED RATE: PLACE 2.75 INCHES OF <br />COMPOSTED MATERIAL AND ROTOTILL INTO 6.25 <br />INCHES OF EXISTING SITE SOILS (A TOTAL <br />AMENDED DEPTH OF ABOUT 9.5 INCHES, FOR A <br />SETTLED DEPTH OF 8 INCHES). <br />2. CALCULATED RATE: PLACE CALCULATED <br />AMOUNT OF COMPOSTED MATERIAL OR <br />APPROVED ORGANIC MATERIAL AND ROTOTILL <br />INTO DEPTH OF SOIL NEEDED TO ACHIEVE 8 <br />INCHES OF SETTLED SOIL AT S% ORGANIC <br />CONTENT. <br />3. WATER OR ROLL TO COMPACT TO 85% OF <br />MAXIMUM DRY DENSITY. RAKE TO LEVEL AND <br />REMOVE SURFACE ROCKS LARGER THAN 1 INCH <br />DIAMETER. <br />EVERETT PUBLIC WORKS <br />YVIKtlIIN4rp" DEPARTMENT <br />rar 1 I"eancnengFirti 1-1-11LIm I — 01/04/20-, <br />POST- CONSTRUCTION SOIL <br />QUALITY AND DEPTH 203 <br />I <br />