Laserfiche WebLink
REVISED <br />—— AREA <br />---------------------�i <br />I <br />II <br />1 <br />I <br />II <br />II <br />I <br />I <br />II <br />II <br />I <br />I <br />I <br />II <br />II <br />/ <br />II <br />PROPOSED <br />i <br />NEW WAREHOUSE <br />11 <br />AREA <br />II <br />II <br />II II <br />O <br />O <br />I <br />/ <br />I <br />I <br />III <br />I <br />II <br />� <br />I <br />I ICI <br />�I <br />I <br />II <br />I <br />EXISTING <br />I <br />I <br />LANDSCAPEo <br />„ <br />I <br />III <br />II <br />EXISTING <br />OFFICE <br />AREA <br />o <br />II <br />III <br />1 <br />i I i <br />i I I <br />i i <br />i <br />o <br />I <br />III <br />I� <br />I <br />I <br />III <br />III <br />II <br />I I <br />j� <br />EXISTING <br />NEW OFFICE <br />MANUFACTURING <br />AREA <br />AREA <br />I <br />I <br />I <br />I <br />I I <br />III <br />III <br />IIII <br />II <br />I <br />I� <br />II <br />:• � <br />I <br />I <br />I <br />III <br />III <br />III <br />II <br />II <br />II <br />� <br />�/ <br />I <br />III <br />I <br />MAINY LF-- <br />, <br />ENTR <br />I <br />I <br />III <br />III <br />I <br />� <br />I <br />I <br />II <br />ICI <br />II <br />EXISTING <br />�I <br />LANDSCAPE <br />---J <br />I.�o <br />I <br />I <br />L <br />— <br />\\ <br />- <br />; <br />r <br />� I <br />EXISTING / <br />EMPLOYEE <br />PATIO <br />r� ; r <br />3D r) j <br />/ <br />r) <br />\ <br />/ <br />r� <br />,,(-+l n r <br />r. <br />Z )c <br />b` l� �: v <br />H � <br />tf7 <br />/ X Q <br />r� <br />0 <br />a <br />2" ladge�poI pine trejstckal <br />pg <br />/ <br />lodriven <br />nto undisturbed ground. <br />Stain brown <br />Water basin with 2" mulc <br />\ <br />sidewalk <br />I <br />Planting pit min. a� <br />twice Ze of root <br />- A�aiaieiA� <br />Undisturbed soil <br />1 <br />STREET TREE PLANTING DETAIL <br />No Scale <br />Prune diseased and <br />broken branches <br />"Ohainlock" or ectuaI <br />tree tie material (1" <br />width); nail or staple <br />tree tie to hold <br />vertically, loop each <br />tie around half tree <br />loosely to provide I" <br />slack for trunk <br />growth <br />Curb <br />Un lazed planting pit <br />su ace <br />/2 topsoil, I/2 native soil, <br />water thoroughly, fertilize <br />Plants <br />o <br />F1=b bead *4th <br />/ <br />Equal <br />\ <br />GROUND COVER SPACING DETAIL <br />/ <br />No Scale- Triangular Spacing <br />NOTES <br />8 6 8 8 .8 8 <br />000000 U00 <br />z� <br />0 <br />A % \ <br />REVISED <br />AREA <br />�D EXISTING <br />LANDSCAPE <br />CO <br />I. 50bgrades, including berms, to within I 1/I0th foot provided by <br />General contractor unless otherwise noted. <br />2. 5ubgrade shall be scarified or rototilled if conditions require. <br />3. 4" depth 3-way topsoil or equal in all planting areas. <br />4. 2" depth fine grade bark mulch In all planting beds. <br />5. All plant material shall be healthy, full and conform to USA <br />standard nursery stock, latest edition. <br />6. Plant material or size or kind not available may be substituted <br />only with approval of Landscape Architect or Owner. <br />1. All mass plantings shall have triangular spacing. <br />,5. All tree pits shall be Inspected to Insure proper drainage. <br />cl. Positive drainage shall be maintained. Mound planting areas <br />minimum 6". <br />10. Landscape Contractor shall maintain site until final inspection and <br />acceptance by Owner. <br />PLANT UST <br />5YMBOL <br />BOTANICAL / COMMON <br />QUANTITY' <br />(D <br />Prunus x hillieri 'Spire' / <br />Spire Cherry <br />6 <br />® <br />Chamaecyporis Hinokl / <br />IO <br />Hinokl Cypress <br />Raphlolepis um. minor 'Gulf Green' <br />/ 35 <br />Gulf Green Yeddo Hawhthorn <br />0 <br />Nandina domestica 'Moon Bay' / <br />34 <br />Moon Bay Nandina <br />0 <br />Ilex crenoto 'Heller! / <br />23 <br />Heller Japanese Holly <br />os B rnerold / <br />ArctoEmerosd <br />Carpet <br />pet Drorf Monzzon to <br />Hydroseeded fine lawn. <br />J1,grode <br />to match existing grades <br />/ <br />\I <br />0E7 <br />isting plant material <br />Note: <br />. Installation Includes <br />removal of stakes one <br />year after installation. <br />2. Adjust tree ties <br />during establishment to <br />allow for growth. <br />SHRUB PLANTING DETAIL <br />SIZE CONDITION <br />2 1/2" col. 545 <br />T min. B8B <br />5 gallon <br />Full 4 bushy <br />2 gallon <br />Full & bushy <br />I gallon <br />Full 8 bushy <br />4" pots <br />8" o.c. <br />full <br />\ / ' CONFIRM ALL PLANT QUANTITIES <br />LANDSCAPE PLAN <br />SCALE:"=20' <br />NORTH <br />O 10' 20' 40' <br />rune diseased and <br />broken branches <br />Water basin with <br />2' mulch <br />Gomga ted topsoil <br />water khorovgnly, <br />fertilize as regd <br />Plantin ole min. <br />twice s�tzehof root ball <br />STATE DF <br />WASHINGTON <br />REGISTERED <br />ITMT <br />Lgiq <br />,KIFlCL N. 3 <br />MAIN STREET DESIGN <br />LANDSCAPE ARCHITECTURE <br />9402 Tidal Court (206) 842-7886 <br />Bainbridge Is., WA 98110 <br />o <br />m <br />wti <br />Y <br />e <br />� <br /><r <br />� <br />m <br />VI <br />C <br />O <br />C <br />LL Q i�: O <br />O <br />}ICO <br />� C <br />n •� <br />Q <br />Q <br />EQ � <br />E <br />_ <br />0 00 <br />a_ <br />LL W <br />Lo <br />CD CD > <br />Cn <br />Q In <br />W <br />W) <br />N <br />— N <br />N <br />Q <br />m <br />U <br />Q 0 <br />N <br />0 <br />U1 <br />U) <br />U <br />N <br />N N <br />m <br />Q <br />F 3 <br />U W <br />J <br />Il <br />Q <br />W <br />Wm <br />J <br />J <br />F m <br />W <br />N <br />w <br />] <br />C <br />I ua <br />Z <br />Q <br />W <br />W <br />W <br />0 <br />DN <br />J <br />D— <br />Y <br />J <br />� <br />J <br />Qm <br />sheet <br />Q <br />