Laserfiche WebLink
EVERETT <br />Everett Permit Services <br />WASHINGTON <br />COST ESTIMATE FOR PERMIT FEE CALCULATION 2022 <br />Date: 3/31/23 <br />Public Works Permit #: PW2304-005 <br />PROJECT NAME: FORMOST FUJI BUILDING ADDITIONS - PHASE II <br />LOCATION: 905 80TH ST SW, EVERETT, WA 98203 <br />DEVELOPER: FORMOST FUJI CORPORATION <br />Name: DENNIS GUNNELL <br />Address: 19211 144TH AVE NE <br />City/State/Zip: WOODINVILLE, WA 98072 <br />Phone: (425)483-9090 email: DENNISG@FORMOSTFUJI.COM <br />Contact: <br />Name: WILL SEMPLE <br />Address: 18215 72ND AVE. SOUTH <br />City/State/Zip: KENT, WA 98032 <br />Phone: (425) 656-7462 email: WSEMPLE@BARGHAUSEN.COM <br />Grading/Cut/Fill (total earth moved) (Cubic Yards): 300 CY <br />Total Asphalt/Concrete Paving (Sq. Ft.)(onsite & offsite): 6,178 SF <br />(For stormwaterSystem Development Fee calculationJ:Total Roof Area (Sq.Ft.): 11,057SF <br />Total Hard Surface Area (ground plus roof areas)(Sq.Ft.): 17,235 SF <br />Total of Public Improvements: $ 0 <br />Total of Private Improvements: ......................................... $ <br />22,349.00 <br />Total Cost (Public + Private Improvements): .................... $ 22,349.00 <br />(Plan review and inspection fee percentages based on this value) <br />For Office Use Only <br />Permit Fee: <br />Erosion Control: $ <br />Grading/Fill/Excavation: $ <br />Asphalt Paving: $ <br />Plan Review Fee: $ <br />Inspection Fee: $ <br />Total: $ <br />Performance Guarantee: $ Required? Yes / No <br />(1.2 X cost of Public Improvements) <br />COST EST FEE CALC - 2022 <br />