My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-36 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />9.2.1.1. Increased Quantities <br />Either party to the Contract will be entitled to renegotiate the price for that portion of the actual <br />quantity in excess of one hundred twenty-five percent (125%) of the original Bid quantity. The <br />price for increased quantities will be determined by agreement of the parties, or, where the <br />parties cannot agree, the price will be determined by the Owner’s Representative based upon <br />the actual costs to perform the Work, including reasonable markup for Overhead and profit. <br />9.2.1.2. Decreased Quantities <br />Either party to the Contract will be entitled to an adjustment of Contract Sum if the actual <br />quantity of Work performed is less than seventy-five percent (75%) of the original Bid quantity. <br />The adjustment of Contract Sum in the case of decreased quantities shall be based upon any <br />increase or decrease in costs due solely to the variation of the estimated quantity. The total <br />payment for any item will be limited to no more than seventy-five percent (75%) of the amount <br />originally Bid for the item. <br />9.2.1.3. Limitations <br />The following limitations shall apply to the adjustment: <br />1. The equipment rates shall be actual cost but shall not exceed the rates set forth in the <br />AGC/WSDOT Equipment Rental Agreement in effect at the time the Work is performed. <br />2. No payment will be made for extended or unabsorbed home office Overhead and field <br />Overhead expenses to the extent that there is an unbalanced allocation of such <br />expenses among the Contract bid items. <br />3. No payment for consequential damages or loss of anticipated profits will be allowed <br />because of variance in quantities from those originally shown in the bid form, Contract <br />provision, and Drawings. <br />When ordered by the Owner’s Representative, the Contractor shall proceed with the Work <br />pending determination of the adjustment of Contract Sum or Contract Time for the variation in <br />quantities. <br />The Owner will not adjust for increases or decreases if the Owner has entered the amount for <br />the item in the bid form only to provide a common Bid for Bidders. <br />9.2.2. Changes in Work Not Covered By Unit Prices <br />Contractor shall be paid for changes in Work not covered by unit prices as provided in 9.5. <br />ADJUSTMENT OF CONTRACT SUM. <br />9.2.3. Deleted Work <br />The Owner’s Representative may delete Work as provided in ARTICLE 6. CHANGES or may <br />terminate the Contract in whole or part as provided in 5.4.2. Termination for Convenience. <br />When the Contract is partially terminated for the Owner’s convenience, the partial termination <br />shall be treated as a deductive Change Order for payment purposes under this section. <br />Payment for completed items will be at Contract unit prices or pursuant to the Schedule of <br />Values. <br />When a Change Order deletes an item in whole or in part, or when the Contract is terminated <br />for convenience in whole or in part, payment for deleted or terminated Work will be made as <br />follows: <br />1. Payment will be made for the actual number of units of Work completed at the unit <br />contract prices unless the Owner’s Representative determines the unit prices are <br />inappropriate for the Work actually performed. When the Owner’s Representative <br />determines the unit prices are inappropriate for the Work actually performed, payment
The URL can be used to link to this page
Your browser does not support the video tag.