IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-39 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />request for adjustment of Contract Sum or Contract Claim based upon a “total cost” or <br />“modified total cost” calculation, in whole or in part, but instead agrees that any and all <br />requests for compensation shall be based upon accurate, complete and contemporaneous <br />cost records that segregate and allocate actual costs (a) between base Contract Work and <br />the work for which additional compensation is sought and (b) between each item of work <br />for which additional compensation is sought. Claims for inefficiency shall only be based on <br />and calculated by a comparison of productivity of similar Work performed in an unaffected <br />or least affected area of the Project. <br />5. No claim for consequential damages of any kind will be allowed. <br />9.5.3 Unabsorbed and Extended Overhead <br />Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be <br />calculated using the Eichleay formula by: <br />1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br />accomplished by multiplying Overhead costs by the ratio of the subject project’s billings <br />to the Contractor’s overall billings during the overall period of the subject Project’s <br />performance. The result is “Allocable Overhead.” <br />a. Any additional and unresolved direct cost claims presented by the Contractor <br />concurrently with any request for Extended and/or Unabsorbed Overhead shall not <br />be included in determining the ratio of the subject Project billings to overall <br />Contractor billings for the period of project performance. <br />2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br />accomplished by dividing the Allocable Overhead for the subject Project by the number <br />of days (as contractually defined) of Contract performance. The result is the Daily Rate <br />of Allocable Overhead. <br />3. Determining the gross amount of potential additional compensation for Home Office <br />Overhead due to the project extension. This is accomplished by multiplying the Daily <br />Rate of Allocable Overhead by the number of days of project extension caused solely by <br />the Owner. This results in the Gross Amount of Additional Home Office Overhead <br />Compensation. <br />4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br />additional contribution for Overhead received by the Contractor on any Change Orders <br />that are being presented and resolved concurrently with the subject calculation for <br />Unabsorbed and/or Extended Home Office Overhead. The necessary adjustment would <br />be to reduce the Gross Amount of Additional Home Office Overhead Compensation by <br />any additional compensation for Overhead included in any direct cost claims being <br />resolved concurrently with any claim for Extended and/or Unabsorbed Home Office <br />Overhead. <br />Contractor shall not receive compensation for cost of use of equity capital. <br />9.6. FORCE ACCOUNT <br />If Work or materials are to be paid for by Force Account, payment amounts will be determined <br />and Contractor shall contemporaneously prepare, keep and maintain records segregated and <br />allocated by time, location and item of Work in compliance with this subsection. Such records <br />must be contemporaneously countersigned by the Owner or the Owner’s Representative (or its <br />designee). Any records not countersigned by the Owner or Owner’s Representative shall be <br />excluded from the calculation of payment under this subsection. <br />The payments provided for herein shall be full payment for all Work done on a Force Account <br />basis. The payment shall be deemed to cover all expenses of every nature, kind, and