My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-41 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />available discounts or rebates if the Owner has provided the Contractor with the means to <br />comply with the provisions allowing the discount. The Owner will then add twenty-one (21) <br />percent of the balance to cover Project overhead, general company Overhead, profit, and any <br />other cost of supplying materials. <br />To support charges for materials, the Contractor shall provide the Owner’s Representative with <br />authentic, complete and accurate copies of vendor invoices, including freight and express bills. <br />If invoices are not available for materials from the Contractor stocks, the Contractor shall certify <br />actual costs by affidavit. <br />If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br />evidence, the Owner’s Representative may determine the cost for all or part of the materials. <br />When determined in this manner, the cost will be the lowest current wholesale price from a <br />source that can supply the required quantity, including delivery costs. <br />The Owner reserves the right to provide materials. If so, the Contractor will receive no payment <br />for any costs, Overhead, or profit on such materials. <br />9.6.3. Equipment <br />The equipment rates shall be actual cost but shall not exceed the rates set forth in the <br />AGC/WSDOT Equipment Rental Agreement in effect at the time the Work is performed. <br />The approval of the Owner’s Representative shall be required for the selection of machine- <br />power tools or equipment prior to their use in Force Account situations. <br />The payment for any machine-power tools or equipment shall be made according to the current <br />AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is <br />authorized. The rates as set forth in the Rental Rate Blue Book (as modified by the current <br />AGC/WSDOT Equipment Rental Agreement) are the maximum rates allowable for equipment of <br />modern design and in good working condition. These rates shall be full compensation for all <br />fuel, oil, lubrication, repairs, maintenance, and all other costs incidental to furnishing and <br />operating the equipment except labor for operation. <br />The Owner will add twenty-one (21) percent to equipment costs to cover Project Overhead, <br />general company Overhead (excluding equipment Overhead included in the Rental Rate Blue <br />Book), and profit. <br />Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental <br />Agreement will be maintained at each region office of the Washington State Department of <br />Transportation and at each of the offices of the Associated General Contractors of America, in <br />Seattle, Spokane, Tacoma, Washington and Wilsonville, Oregon, where they are available for <br />inspection. <br />9.6.4. For Services. <br />Compensation under Force Account for specialized services shall be made on the basis of an <br />invoice from the providing entity. A “specialized service” shall be one that is typically billed <br />through invoice in standard industry practice. Before Work is started, the Owner’s <br />Representative may require the Contractor to obtain multiple quotations for the service to be <br />utilized and select the provider with prices and terms most advantageous to the Owner. In the <br />event that prior quotations are not obtained and the service invoice is submitted by the <br />Subcontractor, then after-the-fact quotations may be obtained by the Owner’s Representative <br />from the open market in the vicinity and the lowest such quotation may be used in place of the <br />submitted invoice. <br />Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) percent <br />of the sum of the costs included on invoices for specialized services to cover project Overhead,
The URL can be used to link to this page
Your browser does not support the video tag.