Laserfiche WebLink
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-51 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />2. Because of such Delay, the Contractor was forced to suspend or significantly interrupt its <br />performance so that it was on standby or idled, and the Owner required the Contractor to <br />be ready to resume performance on short notice. Extended time of performance of <br />Work, such as extensions caused by changes, inefficiencies, or Extra Work, does not <br />constitute suspension or significant interruption of performance. <br />3. The Contractor could not and did not use resources, including but not limited to labor, <br />materials and equipment, standing by or idled on this or any other project for any work <br />during the period of delay; <br />4. The Contractor’s Overhead costs did not materially vary from its usual seasonal <br />Overhead costs during the period of delay; and <br />5. The Delay did not cause Overabsorbed Overhead in the period in which the delayed <br />Work was completed. <br />12.4.3.5.2.1 Resources <br />To demonstrate the Contractor could not and did not use resources, including but not <br />limited to labor, materials and equipment from this Project for any other work on this or <br />any other project during the period of delay (12.4.3.5.2.(3)), the Contractor must: <br />a. Affirmatively represent and warrant that it did not perform substitute Work; <br />b. Identify the specific resources that were idled; and <br />c. Show that those resources did not, and could not, work on other contracts or projects <br />during the Delay. <br />12.4.3.5.2.2 No Material Variations <br />To demonstrate the Contractor’s Overhead costs did not materially vary from its usual <br />seasonal Overhead costs during the period of delay (12.4.3.5.2.(4)), the Contractor <br />must; <br />a. Affirmatively represent and warrant that the completion of the subject Work was <br />extended and that such extension prevented the performance of other work during <br />both the period of delay and the later period of time required to complete the <br />extended Work, <br />b. Disclose the details of Contractor generated billings and Contractor Overhead Costs <br />(as hereinafter defined) throughout the actual project performance. The details of <br />such information should be no less than specific identification of the sources and <br />amounts of revenue on no greater than a monthly basis and specific identification of <br />the types and amounts of Contractor Overhead Costs on no greater than a monthly <br />basis for the actual Project duration. <br />12.4.3.5.2.3 Overabsorbed Overhead <br />To demonstrate that it did not incur Overabsorbed Overhead in the period following the <br />Delay (12.4.3.5.2.(5)), the Contractor must: <br />a. Affirmatively represent and warrant that completion of the delayed Work prevented <br />the performance of other work; <br />b. Identify the critical resource unavailable for other work due to completion of the <br />delayed Contract; and <br />c. Showing that unavailability of this critical resource precluded the performance of <br />other work.