Section 01 22 20 MEASUREMENT AND PAYMENT City of Everett 01 22 20-3 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 1.07 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS A. Payment will not be made for following: 1. Loading, hauling, and disposing of rejected material. 2. Quantities of material wasted or disposed of in manner not called for under Contract Documents. 3. Rejected loads of material, including material rejected after it has been placed by reason of failure of Contractor to conform to provisions of Contract Documents. 4. Material not unloaded from transporting vehicle. 5. Defective Work not accepted by Owner. 6. Material remaining on hand after completion of Work. 1.08 PARTIAL PAYMENT FOR STORED MATERIALS AND EQUIPMENT A. Partial Payment: No partial payments will be made for materials and equipment delivered or stored unless Shop Drawings and preliminary operation and maintenance data is acceptable to Engineer. B. Final Payment: Will be made only for products incorporated in Work; remaining products, for which partial payments have been made, shall revert to Contractor unless otherwise agreed, and partial payments made for those items will be deducted from final payment. 1.09 FORCE ACCOUNT A. The City has estimated and included in the Proposal, dollar amounts for all items to be paid per force account, only to provide a common proposal for Bidders. All such dollar amounts are to become a part of Contractor's total bid. However, the Contracting Agency does not warrant expressly or by implication that the actual amount of work will correspond with those estimates. Payment will be made on the basis of the amount of work actually authorized by Engineer. 1.10 MOBILIZATION/DEMOBILIZATION A. Mobilization shall include the obtaining of all permits; moving onto the site; furnishing and erecting temporary buildings, and other construction facilities; and implementing security requirements; all as required for the proper performance and completion of the Work. Mobilization shall include the following principal items, but not limited to: 1. Moving on to the site of all Contractor's materials and equipment required for first month operations. Also, removing all materials, equipment, temporary utilities, office trailers, etc. from the site. 2. Installing temporary construction power, wiring, and lighting facilities. 3. Establishing fire protection system. 4. Providing construction water supply.