My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 22 20 MEASUREMENT AND PAYMENT City of Everett 01 22 20-5 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 C. The following construction activities and costs shall be considered incidental to the Bid Items of the contract and no separate measurement and payment will be made, but not limited to: 1. Loading, hauling, and properly disposing offsite of demolition, excavation, grading, and other discarded materials unless otherwise noted 2. Construction surveying 3. Developing and updating construction progress schedule 4. Site grading 5. Offsite disposal fees and disposal records, unless otherwise noted 6. Dewatering trenches and excavations (including, but not limited to, pumping equipment, generators, tanks, filters, discharge permits, and if required, water quality treatment and removal of sediment) 7. Saw cutting asphalt pavements, pipes, concrete, and structures 8. Locating existing buried utilities to determine precise location and depth, including potholing 9. Protecting existing utilities and power poles from damage or disturbance, including holding power poles and/or paying utility purveyor to hold power poles 10. Repair or replacement of utilities damaged by construction activities and/or financial reimbursement to affected utility purveyor 11. Furnishing, installing, maintaining, moving, and removing temporary steel trench plating 12. Furnishing, placing, maintaining, and removing cold mix asphalt 13. Dust control 14. Stockpiling and covering suitable native material for uses described in the Specifications and/or Drawings 15. Soil compaction testing and furnishing test reports 16. Moisture conditioning native soils for reuse on site, at optimum moisture content for compaction 17. Watering soils, plants, vegetation, hydroseed 18. Trimming and cleanup 19. Costs for compliance with permit conditions set forth in approved permits 20. Furnishing submittals and manufacturer’s certificates of compliance 21. Coordination and notifications with City staff and its agents, Engineer, governing agencies, property owners, and all other persons and entities participating in, or affected by, construction activities 22. Maintaining continual vehicular access to driveways and plant facilities 23. Furnishing, installing, inspecting, repairing, moving & removing temporary fencing and barricades for security and public safety
The URL can be used to link to this page
Your browser does not support the video tag.