My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />City of Everett 01 26 00-1 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />SECTION 01 26 00 <br />CONTRACT MODIFICATION PROCEDURES <br />PART 1 : GENERAL <br />1.01 SUMMARY <br />A. Changes to the Work may be required due to field conditions, requests made by <br />the City, clarifications to the bid documents, or other needs that result in a <br />change in the cost of the work and/or change in the number of contract days per <br />Section 00 72 00-6. The changes to the work will be tracked individually as <br />Request for Change Proposals (RFCP). Request for Change Proposals may <br />either be prepared as a Field Directive, or as a request for pricing prior to <br />proceeding with the work. <br />B. A change order will be issued for one or more RFCPs grouped into a single <br />change order. Payment for changed work cannot be paid until the change order <br />is finalized and approved as outlined per Section 00 72 00-6. <br />C. The Request for Change Proposal shall clearly identify all labor, material, <br />equipment, incidentals, including subcontractor’s and supplier’s invoices or <br />quotes and Contractor’s timecards. A reference from the latest approved <br />schedule shall be attached justifying any time extension request. Mark ups for all <br />overhead, profit, bond cost, B & O taxes, and insurance shall be added per <br />Section 00 72 00 - General Conditions. <br />D. Contractor, and Subcontractors where required, shall provide a breakdown of <br />labor costs including basic wage rates, fringe benefits, FICA, FUTA, and SUCA <br />add-ons, per Section 00 72 00-9.6. Where premium time is involved, the <br />Contractor shall provide a breakdown of costs in the same detail. <br />1.02 FIELD DIRECTIVE MODIFICATION PROPOSALS <br />A. Changed conditions and/or unanticipated circumstances may require immediate <br />revisions to Work which are essential and from which a delay would result in a <br />time and or cost penalty to the project. When such a condition exists, the City <br />may issue a written Field Directive to the Contractor. <br />B. The City will provide direction for the Contractor identifying the necessary <br />changes to be made. The Field Directive shall be identified with a Request for <br />Change number. The Contractor will provide pricing per 1.01.C. of this Section <br />within 15 calendar days of the completion of the Work. <br />1.03 LUMP SUM MODIFICATION PROPOSALS <br />A. The City may request priced proposals which either add or delete work prior to <br />proceeding with any changes. <br />B. When requested, the Contractor shall provide pricing per 1.01.C. of this Section <br />for review and approval by the City, prior to proceeding with the work.
The URL can be used to link to this page
Your browser does not support the video tag.